Cargando…
Chapter 3: Design of the East Area facility after renovation
The PS primary proton beam is slowly extracted at 24 GeV/c towards the East Area with the help of the third- order resonance technique over a typical spill length of 350 to 450 ns within 2.4 s cycles. The number of East Area extractions is usually around five to six per overall PS super-cycle of typ...
Autores principales: | Bernhard, Johannes Benedikt, Dogru, G, Evrard, S, Froeschl, Robert, Harrouch, E, Lazzaroni, M |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.23731/CYRM-2021-004.17 http://cds.cern.ch/record/2797853 |
Ejemplares similares
-
Chapter 2: East Area renovationMotivations and general description
por: Bernhard, Johannes Benedikt, et al.
Publicado: (2021) -
The CERN East Area Renovation
por: Montbarbon, E, et al.
Publicado: (2019) -
The Beamlines of the CERN East Area Renovation Project
por: Bernhard, Johannes, et al.
Publicado: (2018) -
Study of the energy savings resulting from the East Area renovation
por: Lamaille, Brieuc, et al.
Publicado: (2019) -
CERN Proton Synchrotron East Area Facility: Upgrades and renovation during Long Shutdown 2
por: Bernhard, J, et al.
Publicado: (2021)