Chapter 4: Beamline – main components

The East Area renovation will cover the refurbishment of the East Hall with its beamlines and infrastructures. A re-design of the beamlines is included to improve the magnet situation, the radiation situation, and maintainability in general. Thanks to a cycled powering mode of the magnets instead of...

Descripción completa

Detalles Bibliográficos
Autores principales: Carlsen, B, Carvalho, F, De Jesus, V, De La Gama, J, Ebn Rahmoun, A, Froeschl, Robert, Gourber-Pace, Marine, Grenier-Boley, Edouard, Lopez, R, Mompo, Richard, Papastergiou, Konstantinos, Romagnoli, Giulia, Tan, J, Wilhelm, L
Lenguaje:eng
Publicado: 2021
Materias:
Acceso en línea:https://dx.doi.org/10.23731/CYRM-2021-004.43
http://cds.cern.ch/record/2797854
_version_ 1780972444724494336
author Carlsen, B
Carvalho, F
De Jesus, V
De La Gama, J
Ebn Rahmoun, A
Froeschl, Robert
Gourber-Pace, Marine
Grenier-Boley, Edouard
Lopez, R
Mompo, Richard
Papastergiou, Konstantinos
Romagnoli, Giulia
Tan, J
Wilhelm, L
author_facet Carlsen, B
Carvalho, F
De Jesus, V
De La Gama, J
Ebn Rahmoun, A
Froeschl, Robert
Gourber-Pace, Marine
Grenier-Boley, Edouard
Lopez, R
Mompo, Richard
Papastergiou, Konstantinos
Romagnoli, Giulia
Tan, J
Wilhelm, L
author_sort Carlsen, B
collection CERN
description The East Area renovation will cover the refurbishment of the East Hall with its beamlines and infrastructures. A re-design of the beamlines is included to improve the magnet situation, the radiation situation, and maintainability in general. Thanks to a cycled powering mode of the magnets instead of a steady state one, considerable energy savings will be possible. Therefore, several magnet families have to be re-designed to be in accordance with the purposes of the project. The new East Area magnet system consists of 12 different designs with a total of 58 magnets among which 15 are bending magnets, 31 are quadrupoles, and 12 are correctors. In the Proton Synchrotron (PS) area (Building 352), the primary area (Building 157), and the line T08 (Building 157), the magnets will be cycled every 2.4 s. This concerns the lines F61, F62, part of F63, and T08. The other lines, T09, T10, and T11, will be cycled with a period of 4.8 s. Cycling the magnets is an important constraint for the construction of the magnetic parts (yokes). In addition, the coils have to be adapted to match the power supply specifications. The magnets have to be laminated to avoid eddy currents and large delays between the magnetic field and the current application. All laminated magnets currently used and needed in the new in the East Area layout will be refurbished, this concerns four families (or 22 units). The new magnets will be manufactured by industry according to CERN’s design. Another constraint is the magnet overall size limitations. As the layout was fixed at the beginning of the project, all new large magnet designs had to have the same length and width as the present ones. This complicates the designs, as laminated yokes need a larger mechanical structure around the yoke to maintain the laminations. The total lengths and widths have been discussed with the integration team and after few iterations a solution was found and the final designs approved.
id cern-2797854
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2021
record_format invenio
spelling cern-27978542021-12-14T20:19:10Zdoi:10.23731/CYRM-2021-004.43http://cds.cern.ch/record/2797854engCarlsen, BCarvalho, FDe Jesus, VDe La Gama, JEbn Rahmoun, AFroeschl, RobertGourber-Pace, MarineGrenier-Boley, EdouardLopez, RMompo, RichardPapastergiou, KonstantinosRomagnoli, GiuliaTan, JWilhelm, LChapter 4: Beamline – main componentsAccelerators and Storage RingsThe East Area renovation will cover the refurbishment of the East Hall with its beamlines and infrastructures. A re-design of the beamlines is included to improve the magnet situation, the radiation situation, and maintainability in general. Thanks to a cycled powering mode of the magnets instead of a steady state one, considerable energy savings will be possible. Therefore, several magnet families have to be re-designed to be in accordance with the purposes of the project. The new East Area magnet system consists of 12 different designs with a total of 58 magnets among which 15 are bending magnets, 31 are quadrupoles, and 12 are correctors. In the Proton Synchrotron (PS) area (Building 352), the primary area (Building 157), and the line T08 (Building 157), the magnets will be cycled every 2.4 s. This concerns the lines F61, F62, part of F63, and T08. The other lines, T09, T10, and T11, will be cycled with a period of 4.8 s. Cycling the magnets is an important constraint for the construction of the magnetic parts (yokes). In addition, the coils have to be adapted to match the power supply specifications. The magnets have to be laminated to avoid eddy currents and large delays between the magnetic field and the current application. All laminated magnets currently used and needed in the new in the East Area layout will be refurbished, this concerns four families (or 22 units). The new magnets will be manufactured by industry according to CERN’s design. Another constraint is the magnet overall size limitations. As the layout was fixed at the beginning of the project, all new large magnet designs had to have the same length and width as the present ones. This complicates the designs, as laminated yokes need a larger mechanical structure around the yoke to maintain the laminations. The total lengths and widths have been discussed with the integration team and after few iterations a solution was found and the final designs approved.oai:cds.cern.ch:27978542021
spellingShingle Accelerators and Storage Rings
Carlsen, B
Carvalho, F
De Jesus, V
De La Gama, J
Ebn Rahmoun, A
Froeschl, Robert
Gourber-Pace, Marine
Grenier-Boley, Edouard
Lopez, R
Mompo, Richard
Papastergiou, Konstantinos
Romagnoli, Giulia
Tan, J
Wilhelm, L
Chapter 4: Beamline – main components
title Chapter 4: Beamline – main components
title_full Chapter 4: Beamline – main components
title_fullStr Chapter 4: Beamline – main components
title_full_unstemmed Chapter 4: Beamline – main components
title_short Chapter 4: Beamline – main components
title_sort chapter 4: beamline – main components
topic Accelerators and Storage Rings
url https://dx.doi.org/10.23731/CYRM-2021-004.43
http://cds.cern.ch/record/2797854
work_keys_str_mv AT carlsenb chapter4beamlinemaincomponents
AT carvalhof chapter4beamlinemaincomponents
AT dejesusv chapter4beamlinemaincomponents
AT delagamaj chapter4beamlinemaincomponents
AT ebnrahmouna chapter4beamlinemaincomponents
AT froeschlrobert chapter4beamlinemaincomponents
AT gourberpacemarine chapter4beamlinemaincomponents
AT grenierboleyedouard chapter4beamlinemaincomponents
AT lopezr chapter4beamlinemaincomponents
AT momporichard chapter4beamlinemaincomponents
AT papastergioukonstantinos chapter4beamlinemaincomponents
AT romagnoligiulia chapter4beamlinemaincomponents
AT tanj chapter4beamlinemaincomponents
AT wilhelml chapter4beamlinemaincomponents