Cargando…
Chapter 5 Infrastructure consolidation
Constructed in 1963, Building 157 is 113 m long and 43 m wide at ground level. The roof is 21.8 m high at the central point above a skylight running longitudinally down its centre; it has a slope of 20% running down to the longitudinal façade summits at 15.6 m. The roof is 47.4 m wide as the longit...
Autores principales: | Burdelski, P, Dragoni, F, Grau, Silvia, Guillaume, J-C, Jaillet, D, Mcilwraith, S, Polenghi, M, Sanchez, E |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.23731/CYRM-2021-004.89 http://cds.cern.ch/record/2797855 |
Ejemplares similares
-
Chapter 17: Technical infrastructure
por: Tavian, L, et al.
Publicado: (2020) -
CERN Proton Synchrotron East Area Facility: Upgrades and renovation during Long Shutdown 2
por: Bernhard, J, et al.
Publicado: (2021) -
Chapter 5: Collimation System
por: Appleby, R. B., et al.
Publicado: (2015) -
A new distributed control system for the consolidation of the CERN tertiary infrastructures
por: Scibile, Luigi, et al.
Publicado: (2018) -
Chapter 5: Collimation system
por: Redaelli, Stefano, et al.
Publicado: (2020)