Cargando…

Performance of the DT Phase-2 readout and local reconstruction with cosmic ray data from the DT slice-test

The Phase 2 upgrade of the CMS Drift Tubes electronics targets the detector operation at HL-LHC and will be carried out during LHC Long Shutdown 3: its goal is to make the DT local trigger able to sustain the rates expected at HL-LHC, while improving at the same time its time resolution. In Long Shu...

Descripción completa

Detalles Bibliográficos
Autor principal: CMS Collaboration
Lenguaje:eng
Publicado: 2021
Materias:
Acceso en línea:http://cds.cern.ch/record/2799473
_version_ 1780972547006791680
author CMS Collaboration
author_facet CMS Collaboration
author_sort CMS Collaboration
collection CERN
description The Phase 2 upgrade of the CMS Drift Tubes electronics targets the detector operation at HL-LHC and will be carried out during LHC Long Shutdown 3: its goal is to make the DT local trigger able to sustain the rates expected at HL-LHC, while improving at the same time its time resolution. In Long Shutdown 2 a Slice Test was setup by equipping four DT chambers, in the same sector, with Phase 2 prototype on-board electronics, streaming data to the readout in parallel with the legacy system. Even though the offline reconstruction based on the new system is not expected to change, it must be proved to match the performance of the legacy one.
id cern-2799473
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2021
record_format invenio
spelling cern-27994732022-01-13T20:45:55Zhttp://cds.cern.ch/record/2799473engCMS CollaborationPerformance of the DT Phase-2 readout and local reconstruction with cosmic ray data from the DT slice-testDetectors and Experimental TechniquesThe Phase 2 upgrade of the CMS Drift Tubes electronics targets the detector operation at HL-LHC and will be carried out during LHC Long Shutdown 3: its goal is to make the DT local trigger able to sustain the rates expected at HL-LHC, while improving at the same time its time resolution. In Long Shutdown 2 a Slice Test was setup by equipping four DT chambers, in the same sector, with Phase 2 prototype on-board electronics, streaming data to the readout in parallel with the legacy system. Even though the offline reconstruction based on the new system is not expected to change, it must be proved to match the performance of the legacy one.CMS-DP-2021-036CERN-CMS-DP-2021-036oai:cds.cern.ch:27994732021-12-17
spellingShingle Detectors and Experimental Techniques
CMS Collaboration
Performance of the DT Phase-2 readout and local reconstruction with cosmic ray data from the DT slice-test
title Performance of the DT Phase-2 readout and local reconstruction with cosmic ray data from the DT slice-test
title_full Performance of the DT Phase-2 readout and local reconstruction with cosmic ray data from the DT slice-test
title_fullStr Performance of the DT Phase-2 readout and local reconstruction with cosmic ray data from the DT slice-test
title_full_unstemmed Performance of the DT Phase-2 readout and local reconstruction with cosmic ray data from the DT slice-test
title_short Performance of the DT Phase-2 readout and local reconstruction with cosmic ray data from the DT slice-test
title_sort performance of the dt phase-2 readout and local reconstruction with cosmic ray data from the dt slice-test
topic Detectors and Experimental Techniques
url http://cds.cern.ch/record/2799473
work_keys_str_mv AT cmscollaboration performanceofthedtphase2readoutandlocalreconstructionwithcosmicraydatafromthedtslicetest