Cargando…
Performance of the DT Phase-2 readout and local reconstruction with cosmic ray data from the DT slice-test
The Phase 2 upgrade of the CMS Drift Tubes electronics targets the detector operation at HL-LHC and will be carried out during LHC Long Shutdown 3: its goal is to make the DT local trigger able to sustain the rates expected at HL-LHC, while improving at the same time its time resolution. In Long Shu...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2799473 |