Cargando…

Performance of the DT Phase-2 readout and local reconstruction with cosmic ray data from the DT slice-test

The Phase 2 upgrade of the CMS Drift Tubes electronics targets the detector operation at HL-LHC and will be carried out during LHC Long Shutdown 3: its goal is to make the DT local trigger able to sustain the rates expected at HL-LHC, while improving at the same time its time resolution. In Long Shu...

Descripción completa

Detalles Bibliográficos
Autor principal: CMS Collaboration
Lenguaje:eng
Publicado: 2021
Materias:
Acceso en línea:http://cds.cern.ch/record/2799473