Cargando…
Performance of the DT Phase-2 readout and local reconstruction with cosmic ray data from the DT slice-test
The Phase 2 upgrade of the CMS Drift Tubes electronics targets the detector operation at HL-LHC and will be carried out during LHC Long Shutdown 3: its goal is to make the DT local trigger able to sustain the rates expected at HL-LHC, while improving at the same time its time resolution. In Long Shu...
Autor principal: | CMS Collaboration |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2799473 |
Ejemplares similares
-
DT Slice Test demonstrator results
por: CMS Collaboration
Publicado: (2020) -
DT Phase 2 Slice Test performance in early Run 3 collisions
por: CMS Collaboration
Publicado: (2022) -
DT Slice Test 2021 Calibration Stability plots
por: CMS Collaboration
Publicado: (2022) -
Analytical Method (AM) for DT Trigger Primitive Generation in Phase 2. Slice Test Results with 2021 cosmics data
por: CMS Collaboration
Publicado: (2021) -
DT Local Trigger performance in 2015
por: CMS Collaboration
Publicado: (2015)