CMS RPC activities during LS2 and Commissioning
The second LHC long shutdown period (LS2) was a crucial opportunity to complete the consolidation and upgrade projects for the CMS Resistive Plate Chambers (RPCs). The consolidation included detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. Dedic...
Autor principal: | Barroso Ferreira Filho, Mapse |
---|---|
Lenguaje: | eng |
Publicado: |
SISSA
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.397.0338 http://cds.cern.ch/record/2801878 |
Ejemplares similares
-
CMS RPC Activities During LHC LS-2
por: Shah, M.A., et al.
Publicado: (2020) -
CMS RE4 Re-Validation during LS2 and RPC Phase-2 Upgrade
por: Ribau Almeida, Margarida
Publicado: (2019) -
Associated production of J/psi and Dstar in pp collisions at sqrt(s) = 13 TeV with the full Run 2 data in CMS detector and CMS-RPC upgrade project studies
por: Barroso Ferreira Filho, Mapse
Publicado: (2023) -
CMS RPC commissioning of the existing detector during the long shutdown
por: Cimmino, A, et al.
Publicado: (2014) -
CMS LS2 data taking to commission and test the CMS detectors
por: Ordan, Julien
Publicado: (2020)