Cargando…

CMS RPC activities during LS2 and Commissioning

The second LHC long shutdown period (LS2) was a crucial opportunity to complete the consolidation and upgrade projects for the CMS Resistive Plate Chambers (RPCs). The consolidation included detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. Dedic...

Descripción completa

Detalles Bibliográficos
Autor principal: Barroso Ferreira Filho, Mapse
Lenguaje:eng
Publicado: SISSA 2021
Materias:
Acceso en línea:https://dx.doi.org/10.22323/1.397.0338
http://cds.cern.ch/record/2801878

Ejemplares similares