Commissioning of a New X-Band, Low-Noise LLRF System
To increase beam energy in the CLEAR facility at CERN and study the CLIC accelerating structure prototype in operating conditions, the first X-band test facility at CERN was upgraded in 2020. Both, the acquisition and software systems at X-band test stand 1 (Xbox1) were upgraded to exhibit low phase...
Autores principales: | Edwards, Amelia V, Arévalo, Marçà Boronat, Catalán-Lasheras, Núria, Dexter, Amos, McMonagle, Gerard |
---|---|
Lenguaje: | eng |
Publicado: |
JACoW
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2021-WEPAB038 http://cds.cern.ch/record/2805961 |
Ejemplares similares
-
High-Power Testing Results of X-Band RF-Window and 45 Degrees Spiral Load
por: Boronat, Marça, et al.
Publicado: (2022) -
High-Gradient Breakdown Studies of an X-Band Accelerating Structure Operated in the Reversed Taper Direction
por: Wu, Xiaowei, et al.
Publicado: (2021) -
Construction and Commissioning of the S-Band High-Gradient RF Laboratory at IFIC
por: Esperante Pereira, Daniel, et al.
Publicado: (2018) -
Commissioning of XBox-3: A very high capacity X-band test stand
por: Catalán Lasheras, Nuria, et al.
Publicado: (2017) -
Commissioning of the First Klystron-Based X-Band Power Source at CERN
por: Kovermann, J, et al.
Publicado: (2012)