Cargando…

Construction and Installation of the New CERN Proton Synchrotron Internal Beam Dumps

In the framework of the CERN Large Hadron Collider Injectors Upgrade (LIU) Project, the Proton Synchrotron (PS) has been equipped with two new movable Internal Dumps (PSID), each of them capable of absorbing particle beams of an energy of up to 100 kJ. These dumps replace the old Internal Dumps, whi...

Descripción completa

Detalles Bibliográficos
Autores principales: Andersen, Kristian G, Calviani, Marco, Cherif, Ahmed, Coiffet, Thibaut, De Macedo, Aurelio, Devidal, Sylvain, Geisser, Jean-Marie, Gilardoni, Simone S, Gillet, Martin, Grenier-Boley, Edouard, Heredia, Jorge, Majbour, Abdellhabib, Monnet, Franck, Redondas Monteserín, Manuel, Nuiry, Francois-Xavier, Pugnat, Dominique, Romagnoli, Giulia, Seraphin, Yann, Somoza, José, Thaus, Nicolas
Lenguaje:eng
Publicado: JACoW 2021
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2021-TUPAB031
http://cds.cern.ch/record/2806282