Cargando…

Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain

The LHC injectors Upgrade (LIU) program has been fully implemented during the second long shutdown (LS2), which took place in 2019-20. In this context, new or upgraded beam instrumentation was developed to cope with H⁻ beam in LINAC4 and the new Proton Synchrotron Booster (PSB) injection systems whi...

Descripción completa

Detalles Bibliográficos
Autores principales: Roncarolo, Federico, Bart Pedersen, Stephane, Belleman, Jeroen, Belohrad, David, Bozzolan, Michele, Bracco, Chiara, Di Carlo, Salvatore, Emery, Jonathan, Goldblatt, Aurélie, Guerrero, Ana, Levasseur, Swann, Navarro Fernandez, Araceli, Renner, Elisabeth, Sandberg, Hampus, Storey, James, Tan, Jocelyn, Tassan-Viol, Jean
Lenguaje:eng
Publicado: JACoW 2021
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2021-MOPAB316
http://cds.cern.ch/record/2806715
_version_ 1780973010740576256
author Roncarolo, Federico
Bart Pedersen, Stephane
Belleman, Jeroen
Belohrad, David
Bozzolan, Michele
Bracco, Chiara
Di Carlo, Salvatore
Emery, Jonathan
Goldblatt, Aurélie
Guerrero, Ana
Levasseur, Swann
Navarro Fernandez, Araceli
Renner, Elisabeth
Sandberg, Hampus
Storey, James
Tan, Jocelyn
Tassan-Viol, Jean
author_facet Roncarolo, Federico
Bart Pedersen, Stephane
Belleman, Jeroen
Belohrad, David
Bozzolan, Michele
Bracco, Chiara
Di Carlo, Salvatore
Emery, Jonathan
Goldblatt, Aurélie
Guerrero, Ana
Levasseur, Swann
Navarro Fernandez, Araceli
Renner, Elisabeth
Sandberg, Hampus
Storey, James
Tan, Jocelyn
Tassan-Viol, Jean
author_sort Roncarolo, Federico
collection CERN
description The LHC injectors Upgrade (LIU) program has been fully implemented during the second long shutdown (LS2), which took place in 2019-20. In this context, new or upgraded beam instrumentation was developed to cope with H⁻ beam in LINAC4 and the new Proton Synchrotron Booster (PSB) injection systems which would provide high brightness proton beams in the rest of the injector complex. After a short overview of the newly installed diagnostics, the main focus of this paper will move to the instruments already commissioned with the beam. This will include LINAC4 diagnostics, the PSB H⁰/H⁻ monitor, the PSB Trajectory Measurement System, and the PS beam gas ionization monitor. In addition, particular emphasis will be given to the first operational experience with the new generation of fast wire scanners installed in all injector synchronous.
id cern-2806715
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2021
publisher JACoW
record_format invenio
spelling cern-28067152022-04-14T20:50:14Zdoi:10.18429/JACoW-IPAC2021-MOPAB316http://cds.cern.ch/record/2806715engRoncarolo, FedericoBart Pedersen, StephaneBelleman, JeroenBelohrad, DavidBozzolan, MicheleBracco, ChiaraDi Carlo, SalvatoreEmery, JonathanGoldblatt, AurélieGuerrero, AnaLevasseur, SwannNavarro Fernandez, AraceliRenner, ElisabethSandberg, HampusStorey, JamesTan, JocelynTassan-Viol, JeanCommissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector ChainAccelerators and Storage RingsThe LHC injectors Upgrade (LIU) program has been fully implemented during the second long shutdown (LS2), which took place in 2019-20. In this context, new or upgraded beam instrumentation was developed to cope with H⁻ beam in LINAC4 and the new Proton Synchrotron Booster (PSB) injection systems which would provide high brightness proton beams in the rest of the injector complex. After a short overview of the newly installed diagnostics, the main focus of this paper will move to the instruments already commissioned with the beam. This will include LINAC4 diagnostics, the PSB H⁰/H⁻ monitor, the PSB Trajectory Measurement System, and the PS beam gas ionization monitor. In addition, particular emphasis will be given to the first operational experience with the new generation of fast wire scanners installed in all injector synchronous.JACoWoai:cds.cern.ch:28067152021
spellingShingle Accelerators and Storage Rings
Roncarolo, Federico
Bart Pedersen, Stephane
Belleman, Jeroen
Belohrad, David
Bozzolan, Michele
Bracco, Chiara
Di Carlo, Salvatore
Emery, Jonathan
Goldblatt, Aurélie
Guerrero, Ana
Levasseur, Swann
Navarro Fernandez, Araceli
Renner, Elisabeth
Sandberg, Hampus
Storey, James
Tan, Jocelyn
Tassan-Viol, Jean
Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain
title Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain
title_full Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain
title_fullStr Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain
title_full_unstemmed Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain
title_short Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain
title_sort commissioning the new cern beam instrumentation following the upgrade of the lhc injector chain
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2021-MOPAB316
http://cds.cern.ch/record/2806715
work_keys_str_mv AT roncarolofederico commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain
AT bartpedersenstephane commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain
AT bellemanjeroen commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain
AT belohraddavid commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain
AT bozzolanmichele commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain
AT braccochiara commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain
AT dicarlosalvatore commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain
AT emeryjonathan commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain
AT goldblattaurelie commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain
AT guerreroana commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain
AT levasseurswann commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain
AT navarrofernandezaraceli commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain
AT rennerelisabeth commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain
AT sandberghampus commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain
AT storeyjames commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain
AT tanjocelyn commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain
AT tassanvioljean commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain