Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain
The LHC injectors Upgrade (LIU) program has been fully implemented during the second long shutdown (LS2), which took place in 2019-20. In this context, new or upgraded beam instrumentation was developed to cope with H⁻ beam in LINAC4 and the new Proton Synchrotron Booster (PSB) injection systems whi...
Autores principales: | , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
JACoW
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2021-MOPAB316 http://cds.cern.ch/record/2806715 |
_version_ | 1780973010740576256 |
---|---|
author | Roncarolo, Federico Bart Pedersen, Stephane Belleman, Jeroen Belohrad, David Bozzolan, Michele Bracco, Chiara Di Carlo, Salvatore Emery, Jonathan Goldblatt, Aurélie Guerrero, Ana Levasseur, Swann Navarro Fernandez, Araceli Renner, Elisabeth Sandberg, Hampus Storey, James Tan, Jocelyn Tassan-Viol, Jean |
author_facet | Roncarolo, Federico Bart Pedersen, Stephane Belleman, Jeroen Belohrad, David Bozzolan, Michele Bracco, Chiara Di Carlo, Salvatore Emery, Jonathan Goldblatt, Aurélie Guerrero, Ana Levasseur, Swann Navarro Fernandez, Araceli Renner, Elisabeth Sandberg, Hampus Storey, James Tan, Jocelyn Tassan-Viol, Jean |
author_sort | Roncarolo, Federico |
collection | CERN |
description | The LHC injectors Upgrade (LIU) program has been fully implemented during the second long shutdown (LS2), which took place in 2019-20. In this context, new or upgraded beam instrumentation was developed to cope with H⁻ beam in LINAC4 and the new Proton Synchrotron Booster (PSB) injection systems which would provide high brightness proton beams in the rest of the injector complex. After a short overview of the newly installed diagnostics, the main focus of this paper will move to the instruments already commissioned with the beam. This will include LINAC4 diagnostics, the PSB H⁰/H⁻ monitor, the PSB Trajectory Measurement System, and the PS beam gas ionization monitor. In addition, particular emphasis will be given to the first operational experience with the new generation of fast wire scanners installed in all injector synchronous. |
id | cern-2806715 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2021 |
publisher | JACoW |
record_format | invenio |
spelling | cern-28067152022-04-14T20:50:14Zdoi:10.18429/JACoW-IPAC2021-MOPAB316http://cds.cern.ch/record/2806715engRoncarolo, FedericoBart Pedersen, StephaneBelleman, JeroenBelohrad, DavidBozzolan, MicheleBracco, ChiaraDi Carlo, SalvatoreEmery, JonathanGoldblatt, AurélieGuerrero, AnaLevasseur, SwannNavarro Fernandez, AraceliRenner, ElisabethSandberg, HampusStorey, JamesTan, JocelynTassan-Viol, JeanCommissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector ChainAccelerators and Storage RingsThe LHC injectors Upgrade (LIU) program has been fully implemented during the second long shutdown (LS2), which took place in 2019-20. In this context, new or upgraded beam instrumentation was developed to cope with H⁻ beam in LINAC4 and the new Proton Synchrotron Booster (PSB) injection systems which would provide high brightness proton beams in the rest of the injector complex. After a short overview of the newly installed diagnostics, the main focus of this paper will move to the instruments already commissioned with the beam. This will include LINAC4 diagnostics, the PSB H⁰/H⁻ monitor, the PSB Trajectory Measurement System, and the PS beam gas ionization monitor. In addition, particular emphasis will be given to the first operational experience with the new generation of fast wire scanners installed in all injector synchronous.JACoWoai:cds.cern.ch:28067152021 |
spellingShingle | Accelerators and Storage Rings Roncarolo, Federico Bart Pedersen, Stephane Belleman, Jeroen Belohrad, David Bozzolan, Michele Bracco, Chiara Di Carlo, Salvatore Emery, Jonathan Goldblatt, Aurélie Guerrero, Ana Levasseur, Swann Navarro Fernandez, Araceli Renner, Elisabeth Sandberg, Hampus Storey, James Tan, Jocelyn Tassan-Viol, Jean Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain |
title | Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain |
title_full | Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain |
title_fullStr | Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain |
title_full_unstemmed | Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain |
title_short | Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain |
title_sort | commissioning the new cern beam instrumentation following the upgrade of the lhc injector chain |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2021-MOPAB316 http://cds.cern.ch/record/2806715 |
work_keys_str_mv | AT roncarolofederico commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain AT bartpedersenstephane commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain AT bellemanjeroen commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain AT belohraddavid commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain AT bozzolanmichele commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain AT braccochiara commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain AT dicarlosalvatore commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain AT emeryjonathan commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain AT goldblattaurelie commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain AT guerreroana commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain AT levasseurswann commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain AT navarrofernandezaraceli commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain AT rennerelisabeth commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain AT sandberghampus commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain AT storeyjames commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain AT tanjocelyn commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain AT tassanvioljean commissioningthenewcernbeaminstrumentationfollowingtheupgradeofthelhcinjectorchain |