Cargando…

Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain

The LHC injectors Upgrade (LIU) program has been fully implemented during the second long shutdown (LS2), which took place in 2019-20. In this context, new or upgraded beam instrumentation was developed to cope with H⁻ beam in LINAC4 and the new Proton Synchrotron Booster (PSB) injection systems whi...

Descripción completa

Detalles Bibliográficos
Autores principales: Roncarolo, Federico, Bart Pedersen, Stephane, Belleman, Jeroen, Belohrad, David, Bozzolan, Michele, Bracco, Chiara, Di Carlo, Salvatore, Emery, Jonathan, Goldblatt, Aurélie, Guerrero, Ana, Levasseur, Swann, Navarro Fernandez, Araceli, Renner, Elisabeth, Sandberg, Hampus, Storey, James, Tan, Jocelyn, Tassan-Viol, Jean
Lenguaje:eng
Publicado: JACoW 2021
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2021-MOPAB316
http://cds.cern.ch/record/2806715