Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain
The LHC injectors Upgrade (LIU) program has been fully implemented during the second long shutdown (LS2), which took place in 2019-20. In this context, new or upgraded beam instrumentation was developed to cope with H⁻ beam in LINAC4 and the new Proton Synchrotron Booster (PSB) injection systems whi...
Autores principales: | Roncarolo, Federico, Bart Pedersen, Stephane, Belleman, Jeroen, Belohrad, David, Bozzolan, Michele, Bracco, Chiara, Di Carlo, Salvatore, Emery, Jonathan, Goldblatt, Aurélie, Guerrero, Ana, Levasseur, Swann, Navarro Fernandez, Araceli, Renner, Elisabeth, Sandberg, Hampus, Storey, James, Tan, Jocelyn, Tassan-Viol, Jean |
---|---|
Lenguaje: | eng |
Publicado: |
JACoW
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2021-MOPAB316 http://cds.cern.ch/record/2806715 |
Ejemplares similares
-
Commissioning of the LHC Injectors BWS Upgrade
por: Emery, Jonathan, et al.
Publicado: (2021) -
PSB H0-H⁻ Monitor Calibration and Commissioning
por: Navarro Fernandez, Araceli, et al.
Publicado: (2021) -
Commissioning of the LHC Injectors Upgrade fast wire scanners and first experimental results
por: Di Carlo, S, et al.
Publicado: (2023) -
Installation and Test of Pre-series Wire Scanners for the LHC Injector Upgrade Project at CERN
por: Veness, Raymond, et al.
Publicado: (2017) -
Laboratory and Beam Based Studies for Assessing the Performance of the New Fast Wire Scanners for the CERN Injector Complex
por: Emery, Jonathan, et al.
Publicado: (2019)