What to be implemented at the early stage of a large-scale project

This paper addresses the importance of the actions to be taken before the project planning phases begin. The approach taken stems from the production planning paradigm, with emphasis on the product, rather than on the process. It is argued that a complete part list or product breakdown structure (PB...

Descripción completa

Detalles Bibliográficos
Autores principales: Bachy, Gérard, Hameri, A P
Lenguaje:eng
Publicado: 1995
Materias:
Acceso en línea:https://dx.doi.org/10.1016/S0263-7863(96)00070-1
http://cds.cern.ch/record/280704
_version_ 1780887927648157696
author Bachy, Gérard
Hameri, A P
author_facet Bachy, Gérard
Hameri, A P
author_sort Bachy, Gérard
collection CERN
description This paper addresses the importance of the actions to be taken before the project planning phases begin. The approach taken stems from the production planning paradigm, with emphasis on the product, rather than on the process. It is argued that a complete part list or product breakdown structure (PBS) is the absolute prerequisite for the design of a successful work breakdown structure (WBS) for a project. This process requires the definition of the design and configuration disciplines during the engineering phase. These critical issues of concurrent engineering and product development are also emphasized in the paper. The WBS is, in turn, needed to establish a suitable organizational breakdown structure (OBS or organigram) for the project. Finally, the assembly sequence and the related assembly breakdown structure (ABS) of the end product is required before commencing the project planning phase, which provides the schedules, resource allocation, progress control, and the like for the project management. Detailed definition of the product enables the definition of the work packages within the WBS, which combined with the installation information provide the means to structure the layout for the project organization. The result of the entire process, that begins with the product definition phase and ends with the completion of the planning phase, is called the project management plan. The procedure described in the paper will be used to design the project management plan for the Large Hadron Collider (LHC), a ten-year "ordeal" commencing at the beginning of the 1995, at CERN
id cern-280704
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1995
record_format invenio
spelling cern-2807042023-05-31T13:41:17Zdoi:10.1016/S0263-7863(96)00070-1http://cds.cern.ch/record/280704engBachy, GérardHameri, A PWhat to be implemented at the early stage of a large-scale projectAccelerators and Storage RingsThis paper addresses the importance of the actions to be taken before the project planning phases begin. The approach taken stems from the production planning paradigm, with emphasis on the product, rather than on the process. It is argued that a complete part list or product breakdown structure (PBS) is the absolute prerequisite for the design of a successful work breakdown structure (WBS) for a project. This process requires the definition of the design and configuration disciplines during the engineering phase. These critical issues of concurrent engineering and product development are also emphasized in the paper. The WBS is, in turn, needed to establish a suitable organizational breakdown structure (OBS or organigram) for the project. Finally, the assembly sequence and the related assembly breakdown structure (ABS) of the end product is required before commencing the project planning phase, which provides the schedules, resource allocation, progress control, and the like for the project management. Detailed definition of the product enables the definition of the work packages within the WBS, which combined with the installation information provide the means to structure the layout for the project organization. The result of the entire process, that begins with the product definition phase and ends with the completion of the planning phase, is called the project management plan. The procedure described in the paper will be used to design the project management plan for the Large Hadron Collider (LHC), a ten-year "ordeal" commencing at the beginning of the 1995, at CERNCERN-MT-95-02-DILHC-NOTE-315CERN-LHC-Note-315oai:cds.cern.ch:2807041995-04-21
spellingShingle Accelerators and Storage Rings
Bachy, Gérard
Hameri, A P
What to be implemented at the early stage of a large-scale project
title What to be implemented at the early stage of a large-scale project
title_full What to be implemented at the early stage of a large-scale project
title_fullStr What to be implemented at the early stage of a large-scale project
title_full_unstemmed What to be implemented at the early stage of a large-scale project
title_short What to be implemented at the early stage of a large-scale project
title_sort what to be implemented at the early stage of a large-scale project
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1016/S0263-7863(96)00070-1
http://cds.cern.ch/record/280704
work_keys_str_mv AT bachygerard whattobeimplementedattheearlystageofalargescaleproject
AT hameriap whattobeimplementedattheearlystageofalargescaleproject