Cargando…
LHC Vacuum Supervisory Application for Run 3
The LHC Vacuum Supervisory Control and Data Acquisition application has been upgraded to fulfil the new requirements of Long Shutdown 2 and Run 3. The number of datapoint elements has been increased from 700k to 1.5M, which constitutes a challenge in terms of scalability. The new configuration of pu...
Autores principales: | Blanchard, Sebastien, Amador, Ivo, Chatzigeorgiou, Nikolaos, Ferreira, Rodrigo, Francisco Rebelo, Joao, Gomes, Paulo, Lima, Christopher, Pigny, Gregory, Rocha, Andre, Zygaropoulos, Lampros |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-ICALEPCS2021-TUPV031 http://cds.cern.ch/record/2809473 |
Ejemplares similares
-
Integration of Wireless Mobile Equipment in Supervisory Application
por: Blanchard, Sebastien, et al.
Publicado: (2020) -
Vacuum Controls Configurator: A Web Based Configuration Tool for Large Scale Vacuum Control Systems
por: Rocha, Andre, et al.
Publicado: (2020) -
Measurements, Alarms and Interlocks in the Vacuum Control System of the LHC
por: Pigny, Gregory, et al.
Publicado: (2015) -
LTE/3G-based wireless communications for remote control and monitoring of PLC-controlled mobile vacuum devices
por: Ferreira, Rodrigo, et al.
Publicado: (2018) -
Consolidations on the Vacuum Controls of the CERN Accelerators, During the First Long Shutdown of the LHC
por: Gomes, Paulo, et al.
Publicado: (2015)