Cargando…

CERN SCADA Systems 2020 Large Upgrade Campaign Retrospective

In this paper we report the experience from a large-scale upgrade campaign of SCADA control systems performed during the second LHC Long Shutdown at CERN. Such periodical upgrades are dictated by the ever evolving SCADA WinCC OA system and the CERN frameworks evolution used in those control systems....

Descripción completa

Detalles Bibliográficos
Autores principales: Goralczyk, Lukasz, Kostopoulos, Alexandros Foivos, Schofield, Brad, Tournier, Jean-Charles
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-ICALEPCS2021-MOPV017
http://cds.cern.ch/record/2809569