Cargando…
Metallic structure in SM18 for the HL-LHC IT STRING test stand.
This photo collection shows the works that have been carried out in recent months at SM18 at CERN. Here are photos showing new metallic structure being built in SM18 hall at CERN. In addition, the work will include cleaning and painting, the removal of the old crane and the installation of a new one...
Autor principal: | |
---|---|
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2809962 |
_version_ | 1780973193940434944 |
---|---|
author | Brice, Maximilien |
author_facet | Brice, Maximilien |
author_sort | Brice, Maximilien |
collection | CERN |
description | This photo collection shows the works that have been carried out in recent months at SM18 at CERN. Here are photos showing new metallic structure being built in SM18 hall at CERN. In addition, the work will include cleaning and painting, the removal of the old crane and the installation of a new one, the refurbishment of the Control Room, the installation of the racks for the electronics and the installation of the metallic structure where the string equipment will be located. The components will arrive in the course of this year. SM18 is CERN's main facility for testing superconducting accelerator magnets and superconducting RF cavities. |
id | cern-2809962 |
institution | Organización Europea para la Investigación Nuclear |
publishDate | 2022 |
record_format | invenio |
spelling | cern-28099622022-10-17T14:57:26Zhttp://cds.cern.ch/record/2809962Brice, MaximilienMetallic structure in SM18 for the HL-LHC IT STRING test stand.PhotolabThis photo collection shows the works that have been carried out in recent months at SM18 at CERN. Here are photos showing new metallic structure being built in SM18 hall at CERN. In addition, the work will include cleaning and painting, the removal of the old crane and the installation of a new one, the refurbishment of the Control Room, the installation of the racks for the electronics and the installation of the metallic structure where the string equipment will be located. The components will arrive in the course of this year. SM18 is CERN's main facility for testing superconducting accelerator magnets and superconducting RF cavities.CERN-PHOTO-202205-082oai:cds.cern.ch:28099622022 |
spellingShingle | Photolab Brice, Maximilien Metallic structure in SM18 for the HL-LHC IT STRING test stand. |
title | Metallic structure in SM18 for the HL-LHC IT STRING test stand. |
title_full | Metallic structure in SM18 for the HL-LHC IT STRING test stand. |
title_fullStr | Metallic structure in SM18 for the HL-LHC IT STRING test stand. |
title_full_unstemmed | Metallic structure in SM18 for the HL-LHC IT STRING test stand. |
title_short | Metallic structure in SM18 for the HL-LHC IT STRING test stand. |
title_sort | metallic structure in sm18 for the hl-lhc it string test stand. |
topic | Photolab |
url | http://cds.cern.ch/record/2809962 |
work_keys_str_mv | AT bricemaximilien metallicstructureinsm18forthehllhcitstringteststand |