Interlock System Upgrades at the CERN Accelerator Complex During Long Shutdown 2
The CERN accelerator complex stopped operation at the end of 2018 for the Long Shutdown 2 (LS2), allowing for the LHC Injector Upgrade program (LIU) and consolidation work to be accomplished. A gradual restart of the different accelerators is ongoing in 2021, culminating with the LHC foreseen to be...
Autores principales: | Uythoven, Jan, Antoine, Alain, Martin, Christophe, Mirana Fontan, Adrian, Mompo, Richard, Romera Ramírez, Iván, Secondo, Raffaello |
---|---|
Lenguaje: | eng |
Publicado: |
JACoW
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2021-WEPAB284 http://cds.cern.ch/record/2810009 |
Ejemplares similares
-
The Consolidation of the CERN Beam Interlock System
por: Johnson, Roland, et al.
Publicado: (2021) -
Evaluation of an SFP Based Test Loop for a Future Upgrade of the Optical Transmission for CERN’s Beam Interlock System
por: Secondo, Raffaello, et al.
Publicado: (2019) -
Evolution and Perspectives of Second Generation Magnet Interlock Systems at CERN
por: Romera, Iván, et al.
Publicado: (2016) -
A Retrospective View to the Magnet Interlock Systems at CERN
por: Romera, I, et al.
Publicado: (2014) -
The CERN Beam Interlock System: Principle and Operational Experience
por: Puccio, B, et al.
Publicado: (2010)