Cargando…
DC Beam Stability issues in the first commercial prototype of a High Efficiency 8MW X-Band Klystron
The first commercial prototype of the new High Efficiency (HE) 8MW klystron was built and tested at CETD in the fall of 2021. Unexpectedly, in the first tests with DC beam at different beam voltages, a number of instabilities (self-oscillations) at 21-23GHz were found. As a result, at CERN, we have...
Autores principales: | Syratchev, Igor, Un Nisa, Zaib, Cai, Jinchi, Burt, Graeme Campbell, Anno, Toshiro |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2812566 |
Ejemplares similares
-
Beam Optics Study on a Two-Stage Multibeam Klystron for the Future Circular Collider
por: Cai, Jinchi, et al.
Publicado: (2022) -
CLIC 50 MW L-Band Multi-Beam Klystron
por: Jensen, E, et al.
Publicado: (2005) -
Numerical Analysis of Resonant Multipolar Instabilities in High Power Klystrons
por: Cai, Jinchi, et al.
Publicado: (2021) -
Design Study of X-band High Efficiency Klystrons for CLIC
por: Cai, Jinchi, et al.
Publicado: (2020) -
KlyC. The 1D/1.5D large signal computer code for the Klystron simulations. User Manual. Version 6. (included CGUN for the 2D electron beam optics simulation).
por: Cai, Jinchi, et al.
Publicado: (2022)