Update of the Transverse Proton Synchrotron Impedance Model

The CERN Proton Synchrotron (PS) was recently upgraded to allow reaching the ambitious performance goal of the High-Luminosity LHC Project. This upgrade is part of the LHC Injectors Upgrade project. The final part of the upgrade was performed during Long Shutdown 2 (LS2) to allow injection at higher...

Descripción completa

Detalles Bibliográficos
Autores principales: Joly, Sébastien, Migliorati, Mauro, Mounet, Nicolas, Salvant, Benoit
Lenguaje:eng
Publicado: JACoW 2021
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2021-WEPAB224
http://cds.cern.ch/record/2813075
Descripción
Sumario:The CERN Proton Synchrotron (PS) was recently upgraded to allow reaching the ambitious performance goal of the High-Luminosity LHC Project. This upgrade is part of the LHC Injectors Upgrade project. The final part of the upgrade was performed during Long Shutdown 2 (LS2) to allow injection at higher energy from the PS Booster and a twofold increase in beam intensity and brightness. These changes must be considered in the PS impedance model. The effect on the impedance of the removal of obsolete injection equipment, changes of several accelerator components and new injection energy will be reviewed, as well as the wall impedance of the elliptic beam pipe, thanks to a newly developed code that allows taking into account both the ellipticity and the non-ultra-relativistic nature of the beam.