Cargando…

Update of the Transverse Proton Synchrotron Impedance Model

The CERN Proton Synchrotron (PS) was recently upgraded to allow reaching the ambitious performance goal of the High-Luminosity LHC Project. This upgrade is part of the LHC Injectors Upgrade project. The final part of the upgrade was performed during Long Shutdown 2 (LS2) to allow injection at higher...

Descripción completa

Detalles Bibliográficos
Autores principales: Joly, Sébastien, Migliorati, Mauro, Mounet, Nicolas, Salvant, Benoit
Lenguaje:eng
Publicado: JACoW 2021
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2021-WEPAB224
http://cds.cern.ch/record/2813075
_version_ 1780973381282168832
author Joly, Sébastien
Migliorati, Mauro
Mounet, Nicolas
Salvant, Benoit
author_facet Joly, Sébastien
Migliorati, Mauro
Mounet, Nicolas
Salvant, Benoit
author_sort Joly, Sébastien
collection CERN
description The CERN Proton Synchrotron (PS) was recently upgraded to allow reaching the ambitious performance goal of the High-Luminosity LHC Project. This upgrade is part of the LHC Injectors Upgrade project. The final part of the upgrade was performed during Long Shutdown 2 (LS2) to allow injection at higher energy from the PS Booster and a twofold increase in beam intensity and brightness. These changes must be considered in the PS impedance model. The effect on the impedance of the removal of obsolete injection equipment, changes of several accelerator components and new injection energy will be reviewed, as well as the wall impedance of the elliptic beam pipe, thanks to a newly developed code that allows taking into account both the ellipticity and the non-ultra-relativistic nature of the beam.
id cern-2813075
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2021
publisher JACoW
record_format invenio
spelling cern-28130752022-06-22T20:01:14Zdoi:10.18429/JACoW-IPAC2021-WEPAB224http://cds.cern.ch/record/2813075engJoly, SébastienMigliorati, MauroMounet, NicolasSalvant, BenoitUpdate of the Transverse Proton Synchrotron Impedance ModelAccelerators and Storage RingsThe CERN Proton Synchrotron (PS) was recently upgraded to allow reaching the ambitious performance goal of the High-Luminosity LHC Project. This upgrade is part of the LHC Injectors Upgrade project. The final part of the upgrade was performed during Long Shutdown 2 (LS2) to allow injection at higher energy from the PS Booster and a twofold increase in beam intensity and brightness. These changes must be considered in the PS impedance model. The effect on the impedance of the removal of obsolete injection equipment, changes of several accelerator components and new injection energy will be reviewed, as well as the wall impedance of the elliptic beam pipe, thanks to a newly developed code that allows taking into account both the ellipticity and the non-ultra-relativistic nature of the beam.JACoWoai:cds.cern.ch:28130752021
spellingShingle Accelerators and Storage Rings
Joly, Sébastien
Migliorati, Mauro
Mounet, Nicolas
Salvant, Benoit
Update of the Transverse Proton Synchrotron Impedance Model
title Update of the Transverse Proton Synchrotron Impedance Model
title_full Update of the Transverse Proton Synchrotron Impedance Model
title_fullStr Update of the Transverse Proton Synchrotron Impedance Model
title_full_unstemmed Update of the Transverse Proton Synchrotron Impedance Model
title_short Update of the Transverse Proton Synchrotron Impedance Model
title_sort update of the transverse proton synchrotron impedance model
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2021-WEPAB224
http://cds.cern.ch/record/2813075
work_keys_str_mv AT jolysebastien updateofthetransverseprotonsynchrotronimpedancemodel
AT miglioratimauro updateofthetransverseprotonsynchrotronimpedancemodel
AT mounetnicolas updateofthetransverseprotonsynchrotronimpedancemodel
AT salvantbenoit updateofthetransverseprotonsynchrotronimpedancemodel