LHC rf system performance in 2017

The availability of the LHC ADT and RF systems in 2017 is presented in details, including high-and low-power RF and RF controls. A comparison with 2016 availability is performed. The full-detuning scheme, commissioned early this year, has been operational throughout the year and the first experience...

Descripción completa

Detalles Bibliográficos
Autores principales: Timko, H, Baudrenghien, P, Brunner, O, Butterworth, A, Shaposhnikova, E, Turaj, K, Valuch, D
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:http://cds.cern.ch/record/2813531
Descripción
Sumario:The availability of the LHC ADT and RF systems in 2017 is presented in details, including high-and low-power RF and RF controls. A comparison with 2016 availability is performed. The full-detuning scheme, commissioned early this year, has been operational throughout the year and the first experience with this scheme is summarised. New operational diagnostics, implemented in 2017, are shown as well. Finally, the latest findings from beam dynamics studies and measurements, which have implications for the operation today and in the near future, are highlighted.