Cargando…

LHC rf system performance in 2017

The availability of the LHC ADT and RF systems in 2017 is presented in details, including high-and low-power RF and RF controls. A comparison with 2016 availability is performed. The full-detuning scheme, commissioned early this year, has been operational throughout the year and the first experience...

Descripción completa

Detalles Bibliográficos
Autores principales: Timko, H, Baudrenghien, P, Brunner, O, Butterworth, A, Shaposhnikova, E, Turaj, K, Valuch, D
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:http://cds.cern.ch/record/2813531
_version_ 1780973408923680768
author Timko, H
Baudrenghien, P
Brunner, O
Butterworth, A
Shaposhnikova, E
Turaj, K
Valuch, D
author_facet Timko, H
Baudrenghien, P
Brunner, O
Butterworth, A
Shaposhnikova, E
Turaj, K
Valuch, D
author_sort Timko, H
collection CERN
description The availability of the LHC ADT and RF systems in 2017 is presented in details, including high-and low-power RF and RF controls. A comparison with 2016 availability is performed. The full-detuning scheme, commissioned early this year, has been operational throughout the year and the first experience with this scheme is summarised. New operational diagnostics, implemented in 2017, are shown as well. Finally, the latest findings from beam dynamics studies and measurements, which have implications for the operation today and in the near future, are highlighted.
id cern-2813531
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling cern-28135312022-06-26T21:06:18Zhttp://cds.cern.ch/record/2813531engTimko, HBaudrenghien, PBrunner, OButterworth, AShaposhnikova, ETuraj, KValuch, DLHC rf system performance in 2017Accelerators and Storage RingsThe availability of the LHC ADT and RF systems in 2017 is presented in details, including high-and low-power RF and RF controls. A comparison with 2016 availability is performed. The full-detuning scheme, commissioned early this year, has been operational throughout the year and the first experience with this scheme is summarised. New operational diagnostics, implemented in 2017, are shown as well. Finally, the latest findings from beam dynamics studies and measurements, which have implications for the operation today and in the near future, are highlighted. oai:cds.cern.ch:28135312019
spellingShingle Accelerators and Storage Rings
Timko, H
Baudrenghien, P
Brunner, O
Butterworth, A
Shaposhnikova, E
Turaj, K
Valuch, D
LHC rf system performance in 2017
title LHC rf system performance in 2017
title_full LHC rf system performance in 2017
title_fullStr LHC rf system performance in 2017
title_full_unstemmed LHC rf system performance in 2017
title_short LHC rf system performance in 2017
title_sort lhc rf system performance in 2017
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2813531
work_keys_str_mv AT timkoh lhcrfsystemperformancein2017
AT baudrenghienp lhcrfsystemperformancein2017
AT brunnero lhcrfsystemperformancein2017
AT butterwortha lhcrfsystemperformancein2017
AT shaposhnikovae lhcrfsystemperformancein2017
AT turajk lhcrfsystemperformancein2017
AT valuchd lhcrfsystemperformancein2017