LHC rf system performance in 2017
The availability of the LHC ADT and RF systems in 2017 is presented in details, including high-and low-power RF and RF controls. A comparison with 2016 availability is performed. The full-detuning scheme, commissioned early this year, has been operational throughout the year and the first experience...
Autores principales: | Timko, H, Baudrenghien, P, Brunner, O, Butterworth, A, Shaposhnikova, E, Turaj, K, Valuch, D |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2813531 |
Ejemplares similares
-
Operation Experience with the LHC ACS RF System
por: Turaj, Katarzyna, et al.
Publicado: (2019) -
Status and commissioning plans for LHC Run 2. The RF system.
por: Baudrenghien, P, et al.
Publicado: (2014) -
Operational and beam dynamics aspects of the RF system in 2016
por: Timko, H, et al.
Publicado: (2017) -
RF System Availability and Performance during Run 2
por: Turaj, K, et al.
Publicado: (2019) -
LHC MD 3165: RF power limitations at flat bottom
por: Medina Medrano, Luis Eduardo, et al.
Publicado: (2019)