Cargando…
System's Performances in BI
In this talk, the dependability of CERN's Beam Instrumentation (BI) in 2017 is presented. All faults which contributed to LHC downtime are analysed, categorised and compared to previous years to isolate recurrent failures and evaluate trends. Special attention is given to the Beam Loss Monitori...
Autores principales: | Schramm, V, Viganó, William, Zamantzas, C |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2813541 |
Ejemplares similares
-
The Beam Loss Monitoring System after LHC Long Shutdown 2 at CERN
por: Saccani, Mathieu, et al.
Publicado: (2022) -
The Beam Loss Monitoring System after LHC Injectors Upgrade at CERN
por: Saccani, Mathieu, et al.
Publicado: (2021) -
Implementation of an FPGA based system survey and diagnostic reader with the aim to increase system dependability
por: Alsdorf, M, et al.
Publicado: (2012) -
A Gigabit Ethernet link for an FPGA based Beam Loss Measurement System
por: Kwiatkowski, M, et al.
Publicado: (2013) -
System Architecture for measuring and monitoring Beam Losses in the Injector Complex at CERN
por: Zamantzas, C, et al.
Publicado: (2012)