Machine recovery and re-qualification

Restarting the LHC after the YETS 2017/18 initially included the revalidation of Sector 12 after its intended warm up and the repetition of powering and machine checkout tests as a function of the modifications applied to the relevant systems. This contribution will recall the main activities, the i...

Descripción completa

Detalles Bibliográficos
Autores principales: Zerlauth, M, Bernardi, M, Bednarek, M, Charifoulline, Z, Carlier, E, Chiggiato, P, Diangelo, G, Giachino, R, Pojer, M, Romera, I, Solfaroli, M, Verweij, A
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:http://cds.cern.ch/record/2813551
_version_ 1780973413692604416
author Zerlauth, M
Bernardi, M
Bednarek, M
Charifoulline, Z
Carlier, E
Chiggiato, P
Diangelo, G
Giachino, R
Pojer, M
Romera, I
Solfaroli, M
Verweij, A
author_facet Zerlauth, M
Bernardi, M
Bednarek, M
Charifoulline, Z
Carlier, E
Chiggiato, P
Diangelo, G
Giachino, R
Pojer, M
Romera, I
Solfaroli, M
Verweij, A
author_sort Zerlauth, M
collection CERN
description Restarting the LHC after the YETS 2017/18 initially included the revalidation of Sector 12 after its intended warm up and the repetition of powering and machine checkout tests as a function of the modifications applied to the relevant systems. This contribution will recall the main activities, the implied risks and resulting revalidation needs as well as the resulting planning to allow for an efficient restart of the LHC with beam in 2018 for its last year of physics operation in Run 2.
id cern-2813551
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling cern-28135512022-06-26T21:06:19Zhttp://cds.cern.ch/record/2813551engZerlauth, MBernardi, MBednarek, MCharifoulline, ZCarlier, EChiggiato, PDiangelo, GGiachino, RPojer, MRomera, ISolfaroli, MVerweij, AMachine recovery and re-qualificationAccelerators and Storage RingsRestarting the LHC after the YETS 2017/18 initially included the revalidation of Sector 12 after its intended warm up and the repetition of powering and machine checkout tests as a function of the modifications applied to the relevant systems. This contribution will recall the main activities, the implied risks and resulting revalidation needs as well as the resulting planning to allow for an efficient restart of the LHC with beam in 2018 for its last year of physics operation in Run 2. oai:cds.cern.ch:28135512019
spellingShingle Accelerators and Storage Rings
Zerlauth, M
Bernardi, M
Bednarek, M
Charifoulline, Z
Carlier, E
Chiggiato, P
Diangelo, G
Giachino, R
Pojer, M
Romera, I
Solfaroli, M
Verweij, A
Machine recovery and re-qualification
title Machine recovery and re-qualification
title_full Machine recovery and re-qualification
title_fullStr Machine recovery and re-qualification
title_full_unstemmed Machine recovery and re-qualification
title_short Machine recovery and re-qualification
title_sort machine recovery and re-qualification
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2813551
work_keys_str_mv AT zerlauthm machinerecoveryandrequalification
AT bernardim machinerecoveryandrequalification
AT bednarekm machinerecoveryandrequalification
AT charifoullinez machinerecoveryandrequalification
AT carliere machinerecoveryandrequalification
AT chiggiatop machinerecoveryandrequalification
AT diangelog machinerecoveryandrequalification
AT giachinor machinerecoveryandrequalification
AT pojerm machinerecoveryandrequalification
AT romerai machinerecoveryandrequalification
AT solfarolim machinerecoveryandrequalification
AT verweija machinerecoveryandrequalification