Commissioning of ALPS, the New Beam Position Monitor System of CERN’s Super Proton Synchrotron
The Super Proton Synchrotron (SPS) is both, the final machine in the pre-accelerator chain of the Large Hadron Collider (LHC) at CERN, and a machine providing several experiments with proton and ion beams. In the framework of CERN’s LHC Injectors Upgrade (LIU) project, aimed at improving the perform...
Autores principales: | , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
JACoW
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IBIC2021-MOPP23 http://cds.cern.ch/record/2815318 |
_version_ | 1780973504489848832 |
---|---|
author | Boccardi, Andrea Albertone, Joel Barros Marin, Manoel Bogey, Thierry Kain, Verena Li, Kevin S B Malinowska, Patrycja A Topaloudis, Athanasios Wendt, Manfred |
author_facet | Boccardi, Andrea Albertone, Joel Barros Marin, Manoel Bogey, Thierry Kain, Verena Li, Kevin S B Malinowska, Patrycja A Topaloudis, Athanasios Wendt, Manfred |
author_sort | Boccardi, Andrea |
collection | CERN |
description | The Super Proton Synchrotron (SPS) is both, the final machine in the pre-accelerator chain of the Large Hadron Collider (LHC) at CERN, and a machine providing several experiments with proton and ion beams. In the framework of CERN’s LHC Injectors Upgrade (LIU) project, aimed at improving the performances of the pre-accelerators in view of the high-luminosity upgrade of the LHC, the Beam Position Monitor (BPM) system of the SPS was redesigned during Run 2 of the LHC and deployed during the subsequent Long Shutdown 2 (LS2). This new system is called ALPS (A Logarithmic Position System) and acquires the signals from some 240 BPMs. It is designed to improve the system’s reliability and reduce the required maintenance with respect to its predecessor. During the restart of the SPS in 2021, the BPM system was a key element of the fast recommissioning of the machine, proving the validity of the chosen design approach and pre-beam commissioning strategy. This paper aims to illustrate the design choices made for ALPS, the strategy for commissioning it with beam in parallel with the machine restart, the commissioning procedure and the results obtained. |
id | cern-2815318 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2021 |
publisher | JACoW |
record_format | invenio |
spelling | cern-28153182022-07-09T19:34:27Zdoi:10.18429/JACoW-IBIC2021-MOPP23http://cds.cern.ch/record/2815318engBoccardi, AndreaAlbertone, JoelBarros Marin, ManoelBogey, ThierryKain, VerenaLi, Kevin S BMalinowska, Patrycja ATopaloudis, AthanasiosWendt, ManfredCommissioning of ALPS, the New Beam Position Monitor System of CERN’s Super Proton SynchrotronAccelerators and Storage RingsThe Super Proton Synchrotron (SPS) is both, the final machine in the pre-accelerator chain of the Large Hadron Collider (LHC) at CERN, and a machine providing several experiments with proton and ion beams. In the framework of CERN’s LHC Injectors Upgrade (LIU) project, aimed at improving the performances of the pre-accelerators in view of the high-luminosity upgrade of the LHC, the Beam Position Monitor (BPM) system of the SPS was redesigned during Run 2 of the LHC and deployed during the subsequent Long Shutdown 2 (LS2). This new system is called ALPS (A Logarithmic Position System) and acquires the signals from some 240 BPMs. It is designed to improve the system’s reliability and reduce the required maintenance with respect to its predecessor. During the restart of the SPS in 2021, the BPM system was a key element of the fast recommissioning of the machine, proving the validity of the chosen design approach and pre-beam commissioning strategy. This paper aims to illustrate the design choices made for ALPS, the strategy for commissioning it with beam in parallel with the machine restart, the commissioning procedure and the results obtained.JACoWoai:cds.cern.ch:28153182021 |
spellingShingle | Accelerators and Storage Rings Boccardi, Andrea Albertone, Joel Barros Marin, Manoel Bogey, Thierry Kain, Verena Li, Kevin S B Malinowska, Patrycja A Topaloudis, Athanasios Wendt, Manfred Commissioning of ALPS, the New Beam Position Monitor System of CERN’s Super Proton Synchrotron |
title | Commissioning of ALPS, the New Beam Position Monitor System of CERN’s Super Proton Synchrotron |
title_full | Commissioning of ALPS, the New Beam Position Monitor System of CERN’s Super Proton Synchrotron |
title_fullStr | Commissioning of ALPS, the New Beam Position Monitor System of CERN’s Super Proton Synchrotron |
title_full_unstemmed | Commissioning of ALPS, the New Beam Position Monitor System of CERN’s Super Proton Synchrotron |
title_short | Commissioning of ALPS, the New Beam Position Monitor System of CERN’s Super Proton Synchrotron |
title_sort | commissioning of alps, the new beam position monitor system of cern’s super proton synchrotron |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IBIC2021-MOPP23 http://cds.cern.ch/record/2815318 |
work_keys_str_mv | AT boccardiandrea commissioningofalpsthenewbeampositionmonitorsystemofcernssuperprotonsynchrotron AT albertonejoel commissioningofalpsthenewbeampositionmonitorsystemofcernssuperprotonsynchrotron AT barrosmarinmanoel commissioningofalpsthenewbeampositionmonitorsystemofcernssuperprotonsynchrotron AT bogeythierry commissioningofalpsthenewbeampositionmonitorsystemofcernssuperprotonsynchrotron AT kainverena commissioningofalpsthenewbeampositionmonitorsystemofcernssuperprotonsynchrotron AT likevinsb commissioningofalpsthenewbeampositionmonitorsystemofcernssuperprotonsynchrotron AT malinowskapatrycjaa commissioningofalpsthenewbeampositionmonitorsystemofcernssuperprotonsynchrotron AT topaloudisathanasios commissioningofalpsthenewbeampositionmonitorsystemofcernssuperprotonsynchrotron AT wendtmanfred commissioningofalpsthenewbeampositionmonitorsystemofcernssuperprotonsynchrotron |