Cargando…
Commissioning of ALPS, the New Beam Position Monitor System of CERN’s Super Proton Synchrotron
The Super Proton Synchrotron (SPS) is both, the final machine in the pre-accelerator chain of the Large Hadron Collider (LHC) at CERN, and a machine providing several experiments with proton and ion beams. In the framework of CERN’s LHC Injectors Upgrade (LIU) project, aimed at improving the perform...
Autores principales: | Boccardi, Andrea, Albertone, Joel, Barros Marin, Manoel, Bogey, Thierry, Kain, Verena, Li, Kevin S B, Malinowska, Patrycja A, Topaloudis, Athanasios, Wendt, Manfred |
---|---|
Lenguaje: | eng |
Publicado: |
JACoW
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IBIC2021-MOPP23 http://cds.cern.ch/record/2815318 |
Ejemplares similares
-
Upgrade of the CERN SPS Beam Position Measurement System
por: Wendt, Manfred, et al.
Publicado: (2018) -
Technology and First Beam Tests of the New CERN-SPS Beam Position System
por: Wendt, Manfred, et al.
Publicado: (2019) -
Performance of the AWAKE Proton Beam Line Beam Position Measurement System at CERN
por: Barros Marin, Manoel, et al.
Publicado: (2018) -
AWAKE Proton Beam Commissioning
por: Schmidt, Janet, et al.
Publicado: (2017) -
Hardware & FPGA firmware development in the frame of the Beam Position Monitoring (BPM) system upgrade for the Super Proton Synchrotron (SPS)
por: Barros Marin, Manoel
Publicado: (2021)