Commissioning of the LHC Injectors BWS Upgrade
A novel generation of fast Beam Wire Scanners (BWS), developed in the framework of the LHC Injectors Upgrade (LIU), has been recently deployed in the 3 LHC injector synchrotrons, accelerating protons from 160 MeV to 450 GeV, during the 2019-2020 LHC long shutdown. The monitors feature high precision...
Autores principales: | , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
JACoW
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IBIC2021-TUPP18 http://cds.cern.ch/record/2815955 |
_version_ | 1780973554944180224 |
---|---|
author | Emery, Jonathan Andreazza, William Belohrad, David Di Carlo, Salvatore Esteban Felipe, Jose C Goldblatt, Aurélie Gudkov, Dmitry Guerrero, Ana Jackson, Stephen Lacarrere, Guillaume O Martin Nieto, Miguel Rinaldi, Arnaud T Roncarolo, Federico Schillinger, Christiane Veness, Raymond |
author_facet | Emery, Jonathan Andreazza, William Belohrad, David Di Carlo, Salvatore Esteban Felipe, Jose C Goldblatt, Aurélie Gudkov, Dmitry Guerrero, Ana Jackson, Stephen Lacarrere, Guillaume O Martin Nieto, Miguel Rinaldi, Arnaud T Roncarolo, Federico Schillinger, Christiane Veness, Raymond |
author_sort | Emery, Jonathan |
collection | CERN |
description | A novel generation of fast Beam Wire Scanners (BWS), developed in the framework of the LHC Injectors Upgrade (LIU), has been recently deployed in the 3 LHC injector synchrotrons, accelerating protons from 160 MeV to 450 GeV, during the 2019-2020 LHC long shutdown. The monitors feature high precision motor controller, high resolution wire position monitoring and wide dynamic range secondary particles detectors. This contribution will document the commissioning of the 17 new systems during the accelerator complex restart in 2021, which is an exciting and challenging phase in the life cycle of an instrument. A summary of the so far achieved levels of reliability, reproducibility, detectors/DAQ bandwidth and overall accuracy, will be used to revisit the options for further improving the systems’ performance in the future. |
id | cern-2815955 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2021 |
publisher | JACoW |
record_format | invenio |
spelling | cern-28159552022-07-17T21:30:58Zdoi:10.18429/JACoW-IBIC2021-TUPP18http://cds.cern.ch/record/2815955engEmery, JonathanAndreazza, WilliamBelohrad, DavidDi Carlo, SalvatoreEsteban Felipe, Jose CGoldblatt, AurélieGudkov, DmitryGuerrero, AnaJackson, StephenLacarrere, Guillaume OMartin Nieto, MiguelRinaldi, Arnaud TRoncarolo, FedericoSchillinger, ChristianeVeness, RaymondCommissioning of the LHC Injectors BWS UpgradeAccelerators and Storage RingsA novel generation of fast Beam Wire Scanners (BWS), developed in the framework of the LHC Injectors Upgrade (LIU), has been recently deployed in the 3 LHC injector synchrotrons, accelerating protons from 160 MeV to 450 GeV, during the 2019-2020 LHC long shutdown. The monitors feature high precision motor controller, high resolution wire position monitoring and wide dynamic range secondary particles detectors. This contribution will document the commissioning of the 17 new systems during the accelerator complex restart in 2021, which is an exciting and challenging phase in the life cycle of an instrument. A summary of the so far achieved levels of reliability, reproducibility, detectors/DAQ bandwidth and overall accuracy, will be used to revisit the options for further improving the systems’ performance in the future.JACoWoai:cds.cern.ch:28159552021 |
spellingShingle | Accelerators and Storage Rings Emery, Jonathan Andreazza, William Belohrad, David Di Carlo, Salvatore Esteban Felipe, Jose C Goldblatt, Aurélie Gudkov, Dmitry Guerrero, Ana Jackson, Stephen Lacarrere, Guillaume O Martin Nieto, Miguel Rinaldi, Arnaud T Roncarolo, Federico Schillinger, Christiane Veness, Raymond Commissioning of the LHC Injectors BWS Upgrade |
title | Commissioning of the LHC Injectors BWS Upgrade |
title_full | Commissioning of the LHC Injectors BWS Upgrade |
title_fullStr | Commissioning of the LHC Injectors BWS Upgrade |
title_full_unstemmed | Commissioning of the LHC Injectors BWS Upgrade |
title_short | Commissioning of the LHC Injectors BWS Upgrade |
title_sort | commissioning of the lhc injectors bws upgrade |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IBIC2021-TUPP18 http://cds.cern.ch/record/2815955 |
work_keys_str_mv | AT emeryjonathan commissioningofthelhcinjectorsbwsupgrade AT andreazzawilliam commissioningofthelhcinjectorsbwsupgrade AT belohraddavid commissioningofthelhcinjectorsbwsupgrade AT dicarlosalvatore commissioningofthelhcinjectorsbwsupgrade AT estebanfelipejosec commissioningofthelhcinjectorsbwsupgrade AT goldblattaurelie commissioningofthelhcinjectorsbwsupgrade AT gudkovdmitry commissioningofthelhcinjectorsbwsupgrade AT guerreroana commissioningofthelhcinjectorsbwsupgrade AT jacksonstephen commissioningofthelhcinjectorsbwsupgrade AT lacarrereguillaumeo commissioningofthelhcinjectorsbwsupgrade AT martinnietomiguel commissioningofthelhcinjectorsbwsupgrade AT rinaldiarnaudt commissioningofthelhcinjectorsbwsupgrade AT roncarolofederico commissioningofthelhcinjectorsbwsupgrade AT schillingerchristiane commissioningofthelhcinjectorsbwsupgrade AT venessraymond commissioningofthelhcinjectorsbwsupgrade |