Cargando…
Commissioning of the LHC Injectors BWS Upgrade
A novel generation of fast Beam Wire Scanners (BWS), developed in the framework of the LHC Injectors Upgrade (LIU), has been recently deployed in the 3 LHC injector synchrotrons, accelerating protons from 160 MeV to 450 GeV, during the 2019-2020 LHC long shutdown. The monitors feature high precision...
Autores principales: | Emery, Jonathan, Andreazza, William, Belohrad, David, Di Carlo, Salvatore, Esteban Felipe, Jose C, Goldblatt, Aurélie, Gudkov, Dmitry, Guerrero, Ana, Jackson, Stephen, Lacarrere, Guillaume O, Martin Nieto, Miguel, Rinaldi, Arnaud T, Roncarolo, Federico, Schillinger, Christiane, Veness, Raymond |
---|---|
Lenguaje: | eng |
Publicado: |
JACoW
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IBIC2021-TUPP18 http://cds.cern.ch/record/2815955 |
Ejemplares similares
-
Commissioning of the LHC Injectors Upgrade fast wire scanners and first experimental results
por: Di Carlo, S, et al.
Publicado: (2023) -
Assessing the Performance of the New Beam Wire Scanners for the CERN LHC Injectors
por: Di Carlo, Salvatore, et al.
Publicado: (2022) -
Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain
por: Roncarolo, Federico, et al.
Publicado: (2021) -
Installation and Test of Pre-series Wire Scanners for the LHC Injector Upgrade Project at CERN
por: Veness, Raymond, et al.
Publicado: (2017) -
Laboratory and Beam Based Studies for Assessing the Performance of the New Fast Wire Scanners for the CERN Injector Complex
por: Emery, Jonathan, et al.
Publicado: (2019)