Cargando…
Recommissioning of the CERN Injector Complex Beam Instrumentation
During the last two years, the CERN injector complex has been completely renovated with the aim of providing high intensity and smaller emittance beams to the LHC. A new Linac providing H⁻ has been constructed and major upgrades in the Proton Synchrotrons (PS Booster ring, PS ring and Super PS ring)...
Autor principal: | Veness, Raymond |
---|---|
Lenguaje: | eng |
Publicado: |
JACoW
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IBIC2021-MOOB02 http://cds.cern.ch/record/2816208 |
Ejemplares similares
-
Recommissioning of the COLDEX Experiment at CERN
por: Salemme, Roberto, et al.
Publicado: (2015) -
Recommissioning of the RF System after the SRS Upgrade
por: Counsell, J, et al.
Publicado: (1999) -
Laboratory and Beam Based Studies for Assessing the Performance of the New Fast Wire Scanners for the CERN Injector Complex
por: Emery, Jonathan, et al.
Publicado: (2019) -
Recommissioning of the CERN AD Stochastic Cooling System in 2021 after Long Shutdown 2
por: Höfle, Wolfgang, et al.
Publicado: (2021) -
Performance Assessment of Pre-Series Fast Beam Wire Scanner Prototypes for the Upgrade of the CERN LHC Injector Complex
por: Sirvent, Jose, et al.
Publicado: (2018)