PSB H0-H⁻ Monitor Calibration and Commissioning

During the LHC Long Shutdown 2 (LS2), the H⁻ LINAC4 replaced the proton LINAC2 as Proton Synchrotron Booster (PSB) injector. In each of the four PSB rings, the injection region was upgraded to accommodate the necessary elements for a proper H⁻ charge exchange injection systems. Four internal beam du...

Descripción completa

Detalles Bibliográficos
Autores principales: Navarro Fernandez, Araceli, Belohrad, David, Bracco, Chiara, Renner, Elisabeth, Roncarolo, Federico, Tassan-Viol, Jean
Lenguaje:eng
Publicado: JACoW 2021
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IBIC2021-WEPP24
http://cds.cern.ch/record/2816210
_version_ 1780973567084593152
author Navarro Fernandez, Araceli
Belohrad, David
Bracco, Chiara
Renner, Elisabeth
Roncarolo, Federico
Tassan-Viol, Jean
author_facet Navarro Fernandez, Araceli
Belohrad, David
Bracco, Chiara
Renner, Elisabeth
Roncarolo, Federico
Tassan-Viol, Jean
author_sort Navarro Fernandez, Araceli
collection CERN
description During the LHC Long Shutdown 2 (LS2), the H⁻ LINAC4 replaced the proton LINAC2 as Proton Synchrotron Booster (PSB) injector. In each of the four PSB rings, the injection region was upgraded to accommodate the necessary elements for a proper H⁻ charge exchange injection systems. Four internal beam dumps (one per ring), installed downstream the stripping foil, block the unstripped H⁻ particles not injected in the ring. The H0-H⁻ monitors consists in 4 titanium plates placed few centimetres upstream of the dump, intercepting partially stripped H⁰ or not stripped H⁻ ions. They allow a continuous monitoring of the stripping efficiency and, connected to an interlock system, block the injection process in case of heavy degradation or breakage of the foil, which would heavily damage the dumps. The contribution will focus on the commissioning and operation these new systems. This will include the calibration campaigns, performed by comparison to beam current transformers during special periods with low intensity beams and no stripping foils. During normal operation it was already possible to monitor stripping inefficiencies below 1% and compare different beams and stripping foil types.
id cern-2816210
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2021
publisher JACoW
record_format invenio
spelling cern-28162102022-07-20T22:03:13Zdoi:10.18429/JACoW-IBIC2021-WEPP24http://cds.cern.ch/record/2816210engNavarro Fernandez, AraceliBelohrad, DavidBracco, ChiaraRenner, ElisabethRoncarolo, FedericoTassan-Viol, JeanPSB H0-H⁻ Monitor Calibration and CommissioningAccelerators and Storage RingsDuring the LHC Long Shutdown 2 (LS2), the H⁻ LINAC4 replaced the proton LINAC2 as Proton Synchrotron Booster (PSB) injector. In each of the four PSB rings, the injection region was upgraded to accommodate the necessary elements for a proper H⁻ charge exchange injection systems. Four internal beam dumps (one per ring), installed downstream the stripping foil, block the unstripped H⁻ particles not injected in the ring. The H0-H⁻ monitors consists in 4 titanium plates placed few centimetres upstream of the dump, intercepting partially stripped H⁰ or not stripped H⁻ ions. They allow a continuous monitoring of the stripping efficiency and, connected to an interlock system, block the injection process in case of heavy degradation or breakage of the foil, which would heavily damage the dumps. The contribution will focus on the commissioning and operation these new systems. This will include the calibration campaigns, performed by comparison to beam current transformers during special periods with low intensity beams and no stripping foils. During normal operation it was already possible to monitor stripping inefficiencies below 1% and compare different beams and stripping foil types.JACoWoai:cds.cern.ch:28162102021
spellingShingle Accelerators and Storage Rings
Navarro Fernandez, Araceli
Belohrad, David
Bracco, Chiara
Renner, Elisabeth
Roncarolo, Federico
Tassan-Viol, Jean
PSB H0-H⁻ Monitor Calibration and Commissioning
title PSB H0-H⁻ Monitor Calibration and Commissioning
title_full PSB H0-H⁻ Monitor Calibration and Commissioning
title_fullStr PSB H0-H⁻ Monitor Calibration and Commissioning
title_full_unstemmed PSB H0-H⁻ Monitor Calibration and Commissioning
title_short PSB H0-H⁻ Monitor Calibration and Commissioning
title_sort psb h0-h⁻ monitor calibration and commissioning
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IBIC2021-WEPP24
http://cds.cern.ch/record/2816210
work_keys_str_mv AT navarrofernandezaraceli psbh0hmonitorcalibrationandcommissioning
AT belohraddavid psbh0hmonitorcalibrationandcommissioning
AT braccochiara psbh0hmonitorcalibrationandcommissioning
AT rennerelisabeth psbh0hmonitorcalibrationandcommissioning
AT roncarolofederico psbh0hmonitorcalibrationandcommissioning
AT tassanvioljean psbh0hmonitorcalibrationandcommissioning