Cargando…

PSB H0-H⁻ Monitor Calibration and Commissioning

During the LHC Long Shutdown 2 (LS2), the H⁻ LINAC4 replaced the proton LINAC2 as Proton Synchrotron Booster (PSB) injector. In each of the four PSB rings, the injection region was upgraded to accommodate the necessary elements for a proper H⁻ charge exchange injection systems. Four internal beam du...

Descripción completa

Detalles Bibliográficos
Autores principales: Navarro Fernandez, Araceli, Belohrad, David, Bracco, Chiara, Renner, Elisabeth, Roncarolo, Federico, Tassan-Viol, Jean
Lenguaje:eng
Publicado: JACoW 2021
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IBIC2021-WEPP24
http://cds.cern.ch/record/2816210

Ejemplares similares