PSB H0-H⁻ Monitor Calibration and Commissioning
During the LHC Long Shutdown 2 (LS2), the H⁻ LINAC4 replaced the proton LINAC2 as Proton Synchrotron Booster (PSB) injector. In each of the four PSB rings, the injection region was upgraded to accommodate the necessary elements for a proper H⁻ charge exchange injection systems. Four internal beam du...
Autores principales: | Navarro Fernandez, Araceli, Belohrad, David, Bracco, Chiara, Renner, Elisabeth, Roncarolo, Federico, Tassan-Viol, Jean |
---|---|
Lenguaje: | eng |
Publicado: |
JACoW
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IBIC2021-WEPP24 http://cds.cern.ch/record/2816210 |
Ejemplares similares
-
Commissioning of the Stripping Foil Units for the Upgrade of the PSB H⁻ Injection System
por: Bracco, Chiara, et al.
Publicado: (2017) -
Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain
por: Roncarolo, Federico, et al.
Publicado: (2021) -
Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam
por: Guidoboni, Greta, et al.
Publicado: (2018) -
Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4
por: Mikulec, Bettina, et al.
Publicado: (2017) -
Studies on Transverse Painting for H- Injection into the PSB
por: Bracco, C, et al.
Publicado: (2011)