Cargando…
Calibration of the secondary emission monitors TBIU and TBID of the North Area targets stations T2, T4, and T6 in TCC2 for slow extracted protons of 400 GeV
Autores principales: | Chapman-Hatchett, A, Cultrut, G, Dieperink, J, Fasso, A, Kalbreier, W, Muller, A, Peraire, S, Thomas, D |
---|---|
Lenguaje: | eng |
Publicado: |
1979
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2816600 |
Ejemplares similares
-
Expected signal for the TBID and the ionization chambers downstream of the CNGS target station
por: Sarchiapone, L, et al.
Publicado: (2006) -
Design principles of the target stations for the slow extracted proton beams of the SPS
por: Kalbreier, Willi, et al.
Publicado: (1974) -
TCC2 Bridge Crane Refurbishment
por: Rinaldesi, Roberto
Publicado: (2022) -
BDF target prototype installation in TCC2
por: Ordan, Julien Marius
Publicado: (2018) -
Shielding work around hall TCC2
Publicado: (1978)