Cargando…
Final Acceptance Testing of the CERN SPS Electrostatic Septa
In the framework of the LHC Injector Upgrade (LIU) project, the high field electrostatic septa (so-called ZS) have been upgraded to comply with the new requirements. Prior to their installation in the SPS accelerator in 2020, the septa were tested to verify their final performance. This report summa...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/ISDEIV46977.2021.9587034 http://cds.cern.ch/record/2816640 |
_version_ | 1780973607322648576 |
---|---|
author | Balhan, B Barlow, R A Borburgh, J Farricker, A Mo, J A Prost, A |
author_facet | Balhan, B Barlow, R A Borburgh, J Farricker, A Mo, J A Prost, A |
author_sort | Balhan, B |
collection | CERN |
description | In the framework of the LHC Injector Upgrade (LIU) project, the high field electrostatic septa (so-called ZS) have been upgraded to comply with the new requirements. Prior to their installation in the SPS accelerator in 2020, the septa were tested to verify their final performance. This report summarises the results of these final acceptance tests, covering the vacuum acceptance test, the HV conditioning, the final beam impedance measurements together with the ZS interconnects and validation of the upgraded ion trap system. |
id | cern-2816640 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2021 |
record_format | invenio |
spelling | cern-28166402022-07-26T19:11:48Zdoi:10.1109/ISDEIV46977.2021.9587034http://cds.cern.ch/record/2816640engBalhan, BBarlow, R ABorburgh, JFarricker, AMo, J AProst, AFinal Acceptance Testing of the CERN SPS Electrostatic SeptaAccelerators and Storage RingsIn the framework of the LHC Injector Upgrade (LIU) project, the high field electrostatic septa (so-called ZS) have been upgraded to comply with the new requirements. Prior to their installation in the SPS accelerator in 2020, the septa were tested to verify their final performance. This report summarises the results of these final acceptance tests, covering the vacuum acceptance test, the HV conditioning, the final beam impedance measurements together with the ZS interconnects and validation of the upgraded ion trap system.oai:cds.cern.ch:28166402021 |
spellingShingle | Accelerators and Storage Rings Balhan, B Barlow, R A Borburgh, J Farricker, A Mo, J A Prost, A Final Acceptance Testing of the CERN SPS Electrostatic Septa |
title | Final Acceptance Testing of the CERN SPS Electrostatic Septa |
title_full | Final Acceptance Testing of the CERN SPS Electrostatic Septa |
title_fullStr | Final Acceptance Testing of the CERN SPS Electrostatic Septa |
title_full_unstemmed | Final Acceptance Testing of the CERN SPS Electrostatic Septa |
title_short | Final Acceptance Testing of the CERN SPS Electrostatic Septa |
title_sort | final acceptance testing of the cern sps electrostatic septa |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.1109/ISDEIV46977.2021.9587034 http://cds.cern.ch/record/2816640 |
work_keys_str_mv | AT balhanb finalacceptancetestingofthecernspselectrostaticsepta AT barlowra finalacceptancetestingofthecernspselectrostaticsepta AT borburghj finalacceptancetestingofthecernspselectrostaticsepta AT farrickera finalacceptancetestingofthecernspselectrostaticsepta AT moja finalacceptancetestingofthecernspselectrostaticsepta AT prosta finalacceptancetestingofthecernspselectrostaticsepta |