Cargando…

J-PARC Contributions to the LHC Injector Upgrade (LIU) Project

The LHC Injector Upgrade (LIU) was launched in 2010 in synergy with the High Luminosity LHC (HL-LHC) project.^2) It includes the consolidation/upgrade of the PS Booster RF systems:^3,4) all the existing ferrite-loaded RF cavities are being replaced with wideband RF systems during the 2019–2020 long...

Descripción completa

Detalles Bibliográficos
Autores principales: Ohmori, Chihiro, Paoluzzi, Mauro, Tamura, Fumihiko, Hasegawa, Katsushi, Sugiyama, Yasuyuki, Shirakata, Masashi, Yoshii, Masahito
Lenguaje:eng
Publicado: 2021
Materias:
Acceso en línea:https://dx.doi.org/10.7566/JPSCP.33.011006
http://cds.cern.ch/record/2824415
_version_ 1780973699809148928
author Ohmori, Chihiro
Paoluzzi, Mauro
Tamura, Fumihiko
Hasegawa, Katsushi
Sugiyama, Yasuyuki
Shirakata, Masashi
Yoshii, Masahito
author_facet Ohmori, Chihiro
Paoluzzi, Mauro
Tamura, Fumihiko
Hasegawa, Katsushi
Sugiyama, Yasuyuki
Shirakata, Masashi
Yoshii, Masahito
author_sort Ohmori, Chihiro
collection CERN
description The LHC Injector Upgrade (LIU) was launched in 2010 in synergy with the High Luminosity LHC (HL-LHC) project.^2) It includes the consolidation/upgrade of the PS Booster RF systems:^3,4) all the existing ferrite-loaded RF cavities are being replaced with wideband RF systems during the 2019–2020 long shut down. The magnetic-annealed cores improve the cavity performance and reduce the number of the straight sections for RF systems. In 2013, during the first long shut down of the LHC, LS1, we performed a beam loading test in J-PARC using a one-cell type Booster cavity. The beam test using a high intensity beam proved that direct-feedback can work in conjunction with the other beam loading compensation system.^5) J-PARC also cooperates on the R&D; of a Rad-Hard solid-state amplifier. A recent irradiation test shows that the amplifier can withstand up to 2 kGy under mixed field irradiation.^6) J-PARC contributions for the LIU project will be reported.
id cern-2824415
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2021
record_format invenio
spelling cern-28244152022-08-11T18:17:05Zdoi:10.7566/JPSCP.33.011006http://cds.cern.ch/record/2824415engOhmori, ChihiroPaoluzzi, MauroTamura, FumihikoHasegawa, KatsushiSugiyama, YasuyukiShirakata, MasashiYoshii, MasahitoJ-PARC Contributions to the LHC Injector Upgrade (LIU) ProjectAccelerators and Storage RingsThe LHC Injector Upgrade (LIU) was launched in 2010 in synergy with the High Luminosity LHC (HL-LHC) project.^2) It includes the consolidation/upgrade of the PS Booster RF systems:^3,4) all the existing ferrite-loaded RF cavities are being replaced with wideband RF systems during the 2019–2020 long shut down. The magnetic-annealed cores improve the cavity performance and reduce the number of the straight sections for RF systems. In 2013, during the first long shut down of the LHC, LS1, we performed a beam loading test in J-PARC using a one-cell type Booster cavity. The beam test using a high intensity beam proved that direct-feedback can work in conjunction with the other beam loading compensation system.^5) J-PARC also cooperates on the R&D; of a Rad-Hard solid-state amplifier. A recent irradiation test shows that the amplifier can withstand up to 2 kGy under mixed field irradiation.^6) J-PARC contributions for the LIU project will be reported.oai:cds.cern.ch:28244152021
spellingShingle Accelerators and Storage Rings
Ohmori, Chihiro
Paoluzzi, Mauro
Tamura, Fumihiko
Hasegawa, Katsushi
Sugiyama, Yasuyuki
Shirakata, Masashi
Yoshii, Masahito
J-PARC Contributions to the LHC Injector Upgrade (LIU) Project
title J-PARC Contributions to the LHC Injector Upgrade (LIU) Project
title_full J-PARC Contributions to the LHC Injector Upgrade (LIU) Project
title_fullStr J-PARC Contributions to the LHC Injector Upgrade (LIU) Project
title_full_unstemmed J-PARC Contributions to the LHC Injector Upgrade (LIU) Project
title_short J-PARC Contributions to the LHC Injector Upgrade (LIU) Project
title_sort j-parc contributions to the lhc injector upgrade (liu) project
topic Accelerators and Storage Rings
url https://dx.doi.org/10.7566/JPSCP.33.011006
http://cds.cern.ch/record/2824415
work_keys_str_mv AT ohmorichihiro jparccontributionstothelhcinjectorupgradeliuproject
AT paoluzzimauro jparccontributionstothelhcinjectorupgradeliuproject
AT tamurafumihiko jparccontributionstothelhcinjectorupgradeliuproject
AT hasegawakatsushi jparccontributionstothelhcinjectorupgradeliuproject
AT sugiyamayasuyuki jparccontributionstothelhcinjectorupgradeliuproject
AT shirakatamasashi jparccontributionstothelhcinjectorupgradeliuproject
AT yoshiimasahito jparccontributionstothelhcinjectorupgradeliuproject