Cargando…

Software based readout driver evolution towards 1 MHz readout as part of the ATLAS HL-LHC upgrade

The High-Luminosity Large Hadron Collider (HL-LHC), which should begin operation in 2029, aims to increase LHC luminosity by a factor of 10 beyond its original design. In preparation for this increase, the ATLAS experiment has planned a major upgrade program that is split into two steps. During the...

Descripción completa

Detalles Bibliográficos
Autores principales: Kolos, Serguei, ATLAS TDAQ Collaboration
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:http://cds.cern.ch/record/2824996
_version_ 1780973748303691776
author Kolos, Serguei
ATLAS TDAQ Collaboration
author_facet Kolos, Serguei
ATLAS TDAQ Collaboration
author_sort Kolos, Serguei
collection CERN
description The High-Luminosity Large Hadron Collider (HL-LHC), which should begin operation in 2029, aims to increase LHC luminosity by a factor of 10 beyond its original design. In preparation for this increase, the ATLAS experiment has planned a major upgrade program that is split into two steps. During the “Phase-I” step, that will be completed in 2022, several new trigger and detector systems have been introduced and a new software application, called Software Readout Driver (SW ROD) developed to read data from these new systems. The SW ROD receives and aggregates data from the detector front-end electronics via the Front-End Link eXchange (FELIX) system. For LHC Run 3, which begins in 2022, the SW ROD will be used in parallel with the legacy Readout System (ROS), both operating at an input rate of 100 kHz. For the ‘Phase-II’ upgrade step, to be completed after Run 3 in time for Run 4 in 2029, the legacy ROS will be completely replaced with a new system based on the next generation of FELIX and a new software application called the Data Handler. The Data Handler is an evolution of the SW ROD that has the same functional requirements but must be able to operate at an input rate of 1~MHz. This contribution describes the design and implementation of the SW ROD application for Run 3. It also presents and discusses the results of performance measurements which demonstrate that the SW ROD application already fulfils the Phase-II performance requirements by being able to process data at a 1~MHz rate for realistic Phase-II input configurations.
id cern-2824996
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2022
record_format invenio
spelling cern-28249962022-08-20T19:58:03Zhttp://cds.cern.ch/record/2824996engKolos, SergueiATLAS TDAQ CollaborationSoftware based readout driver evolution towards 1 MHz readout as part of the ATLAS HL-LHC upgradeParticle Physics - ExperimentThe High-Luminosity Large Hadron Collider (HL-LHC), which should begin operation in 2029, aims to increase LHC luminosity by a factor of 10 beyond its original design. In preparation for this increase, the ATLAS experiment has planned a major upgrade program that is split into two steps. During the “Phase-I” step, that will be completed in 2022, several new trigger and detector systems have been introduced and a new software application, called Software Readout Driver (SW ROD) developed to read data from these new systems. The SW ROD receives and aggregates data from the detector front-end electronics via the Front-End Link eXchange (FELIX) system. For LHC Run 3, which begins in 2022, the SW ROD will be used in parallel with the legacy Readout System (ROS), both operating at an input rate of 100 kHz. For the ‘Phase-II’ upgrade step, to be completed after Run 3 in time for Run 4 in 2029, the legacy ROS will be completely replaced with a new system based on the next generation of FELIX and a new software application called the Data Handler. The Data Handler is an evolution of the SW ROD that has the same functional requirements but must be able to operate at an input rate of 1~MHz. This contribution describes the design and implementation of the SW ROD application for Run 3. It also presents and discusses the results of performance measurements which demonstrate that the SW ROD application already fulfils the Phase-II performance requirements by being able to process data at a 1~MHz rate for realistic Phase-II input configurations.ATL-DAQ-PROC-2022-009oai:cds.cern.ch:28249962022-08-20
spellingShingle Particle Physics - Experiment
Kolos, Serguei
ATLAS TDAQ Collaboration
Software based readout driver evolution towards 1 MHz readout as part of the ATLAS HL-LHC upgrade
title Software based readout driver evolution towards 1 MHz readout as part of the ATLAS HL-LHC upgrade
title_full Software based readout driver evolution towards 1 MHz readout as part of the ATLAS HL-LHC upgrade
title_fullStr Software based readout driver evolution towards 1 MHz readout as part of the ATLAS HL-LHC upgrade
title_full_unstemmed Software based readout driver evolution towards 1 MHz readout as part of the ATLAS HL-LHC upgrade
title_short Software based readout driver evolution towards 1 MHz readout as part of the ATLAS HL-LHC upgrade
title_sort software based readout driver evolution towards 1 mhz readout as part of the atlas hl-lhc upgrade
topic Particle Physics - Experiment
url http://cds.cern.ch/record/2824996
work_keys_str_mv AT kolosserguei softwarebasedreadoutdriverevolutiontowards1mhzreadoutaspartoftheatlashllhcupgrade
AT atlastdaqcollaboration softwarebasedreadoutdriverevolutiontowards1mhzreadoutaspartoftheatlashllhcupgrade