Cargando…
Two-frequency beam-loading compensation in the drive-beam accelerator of the CLIC test facility
Autores principales: | Braun, HH, Valentini, Μ |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2828393 |
Ejemplares similares
-
Two frequency beam-loading compensation in the drive-beam accelerator of the CLIC Test Facility
por: Braun, Hans Heinrich, et al.
Publicado: (1999) -
Second Order Beam-Loading Compensation in the Drive-Beam Accelerator of the CLIC Test Facility
por: Valentini, M, et al.
Publicado: (2000) -
Multi-frequency acceleration for the CLIC drive linac with beam loading and HOM compensation
por: Thorndahl, L
Publicado: (1994) -
Multi-frequency acceleration for the CLIC drive linac with beam loading and HOM compensation
por: Thorndahl, L
Publicado: (1994) -
Beam-loading Compensation Experiment in the CLIC Test Facility. Modelling and Simulation
por: Kononenko, Oleksiy, et al.
Publicado: (2013)