Cargando…
High intensity proton beams in a multi-cycled SPS
The SPS ran for 247 days during 1994; 64% of this was with high intensity proton beam for physics data taking in the Fixed Target mode of operation, 12% was for a lead run at the end of the year, with the remaining 24% spent in setting up and machine development. The SPS supplied LEP with 8 bunches...
Autores principales: | Faugier, A, Altuna, X, Bailey, R, Blanchard, R R, Bohl, T, Burkhardt, H, Collier, Paul, Cornelis, Karel, Garrel, N, Hilaire, A, Jonker, M, Keizer, Reinder L, Lamont, M, Linnecar, Trevor Paul R, de Rijk, G, Roy, G, Schmickler, Hermann, Wenninger, J |
---|---|
Lenguaje: | eng |
Publicado: |
1995
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/282844 |
Ejemplares similares
-
The SPS as accelerator of Pb$^{82+}$ ions
por: Faugier, A, et al.
Publicado: (1995) -
The SPS as lead-ion accelerator
por: Altuna, X, et al.
Publicado: (1996) -
Operational procedures to obtain high beam-beam tune shifts in LEP pretzel operation
por: Bailey, R, et al.
Publicado: (1995) -
LEP operation in 1992 with a 90$^0$ optics
por: Bailey, R, et al.
Publicado: (1993) -
LEP1 operation, 1989-1995
por: Arduini, Gianluigi, et al.
Publicado: (1996)