Cargando…
PS Technical Meeting N° 30: 1993 Shutdown Planning
Autores principales: | Allardyce, BW, Danloy, L |
---|---|
Lenguaje: | eng |
Publicado: |
1992
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2829437 |
Ejemplares similares
-
PS Technical Meeting No 31 held on 14.01.1993: Low and very low energy beams at LEAR in 1993
por: Allardyce, BW
Publicado: (1993) -
Minutes of PS technical meeting N°41 held on 7th June 1993: Consequences of postponing the PSB energy upgrade beyond the year 2000
por: Allardyce, BW
Publicado: (1993) -
Minutes of PS technical meeting No 34 held on 3rd March 1993: Collaboration with Russian Labs in the domain of instrumentation and controls
por: Allardyce, BW
Publicado: (1993) -
PS Technical Meeting N° 27: Follow-up on Lead-Linac Project
por: Allardyce, BW
Publicado: (1992) -
Compte rendu de la reunion technique PS No 35 du 30 Avril 1993
por: Allardyce, BW
Publicado: (1993)