Cargando…
Establishing a Kicker Gap in the PS for Extraction of LHC Beam
Autor principal: | Brennan, JM |
---|---|
Lenguaje: | eng |
Publicado: |
1996
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2830628 |
Ejemplares similares
-
Establishing a Kicker Gap in the PS for Extraction of LHC Beam
por: Brennan, J M
Publicado: (1996) -
A Beam-based Measurement of the LHC Beam Dump Kicker Waveform
por: Fraser, Matthew, et al.
Publicado: (2016) -
Calculation of the LHC-kicker beam impedance
por: Lambertson, Glen R
Publicado: (1999) -
Considerations on an Upgrade Possibility of the LHC Beam Dump Kicker System
por: Fraser, Matthew, et al.
Publicado: (2016) -
The PS Injection Kicker KFA45 Performance for LHC
por: Metzmacher, K D, et al.
Publicado: (2002)