Cargando…
List of work to be done during the March - April 1963 shutdown of the P.S.
Autor principal: | Gouiran, R |
---|---|
Lenguaje: | eng |
Publicado: |
1963
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2832175 |
Ejemplares similares
-
List of jobs which could be done during the November 1963 shutdown of the P.S.
por: Gouiran, R
Publicado: (1963) -
Work to be done during the P.S. shutdown from 27 March, 1964 to 29 April, 1964
por: Gouiran, R
Publicado: (1964) -
Collected abstracts of reports on some special works done at the CERN PS during the years 1962 and 1963
por: Gouiran, Robert
Publicado: (1964) -
List of Works to be done during the Shut-down of the P.S. Machine from 27th December 1961 to 16th January 1962
por: Gouiran, R
Publicado: (1961) -
List of work to be done during the September - October shut-down of the PS: 27th August - 23rd October 1962
por: Gouiran, R
Publicado: (1962)