Cargando…

The PolariX-TDS Project: Bead-Pull Measurements and High-Power Test on the Prototype

A collaboration between DESY, PSI and CERN has been established to develop and build an advanced modular X- band transverse deflection structure (TDS) system with the new feature of providing variable polarization of the deflecting force. The prototype of the novel X-band TDS, the Polarizable X-band...

Descripción completa

Detalles Bibliográficos
Autores principales: Craievich, Paolo, Aßmann, Ralph, Bopp, Markus, Braun, Hans-Heinrich, Catalán Lasheras, Nuria, Christie, Florian, Citterio, Alessandro, D'Arcy, Richard, Dorda, Ulrich, Foese, Manon, Ganter, Romain, Gonzalez Caminal, Pau, Grudiev, Alexej, Hoffmann, Matthias, Hüning, Markus, Jonas, Rolf, Kleeb, Thomas, Krebs, Olaf, Lederer, Sven, Libov, Vladyslav, Marcellini, Fabio, Marchetti, Barbara, Marx, Daniel, McMonagle, Gerard, Millar, William, Osterhoff, Jens, Pedrozzi, Marco, Pitman, Sam, Prat, Eduard, Reiche, Sven, Reukauff, Matthias, Schlarb, Holger, Schreiber, Siegfried, Szypula, Kamil, Tews, Gerd, Vogt, Mathias, Wagner, Antonio de Zubiaurre, Wuensch, Walter, del Pozo Romano, Veronica
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-FEL2019-WEP036
http://cds.cern.ch/record/2834121
Descripción
Sumario:A collaboration between DESY, PSI and CERN has been established to develop and build an advanced modular X- band transverse deflection structure (TDS) system with the new feature of providing variable polarization of the deflecting force. The prototype of the novel X-band TDS, the Polarizable X-band (PolariX) TDS, was fabricated at PSI following the high-precision tuning-free production process developed for the C-band Linac of the SwissFEL project. Bead-pull RF measurements were also performed at PSI to verify, in particular, that the polarization of the dipole fields does not have any rotation along the structure. The high-power test was performed at CERN and now the TDS is at DESY and has been installed in FLASHForward, where the first streaking experience with beam will be accomplished. We summarize in this paper the status of the project, the results of the bead-pull measurements and the high power test.