Cargando…
Establishing the Quality Assurance Programme for the Strip Sensor Production of the ATLAS Tracker Upgrade Including Irradiation with Neutrons, Photons and Protons to HL-LHC Fluences
The successful pre-production delivery of strip sensors for the new Inner Tracker ITk for the upgraded ATLAS detector at the High Luminosity LHC CERN has completed and based on their performance full production has commenced. The overall delivery period is anticipated to last 4 years to complete the...
Autores principales: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2835574 |
Sumario: | The successful pre-production delivery of strip sensors for the new Inner Tracker ITk for the upgraded ATLAS detector at the High Luminosity LHC CERN has completed and based on their performance full production has commenced. The overall delivery period is anticipated to last 4 years to complete the approximately 22000 sensors required for the ITk. For Quality Assurance QA, a number of test structures designed by the collaboration, along with a large area diode and miniature version of the main sensor, are produced in every wafer by the foundry Hamamatsu Photonics K.K HPK. As well as Quality Control QC checks on every main sensor, samples of the QA pieces from each delivery batch are tested both before and after irradiation with results after exposure to neutrons, gammas or protons to doses corresponding to those anticipated after operation at the HL-LHC to roughly 1.5 times the ultimate integrated luminosity of 4000~fb$^{-1}$. In this paper are presented the procedures and the studies carried out to establish that the seven ITk QA Strip Sensor irradiation and test sites meet all the requirements to support this very extensive programme throughout the strip sensor production phase for the ITk project. |
---|