Cargando…
The MYRRHA Project
The main objective of MYRRHA (Multi-purpose hybrid Research Reactor for High-tech Applications) at SCK•CEN, the Belgian Nuclear Research Centre, is to demonstrate the large scale feasibility of nuclear waste transmutation using an Accelerator Driven System (ADS). It is based on a high power cw opera...
Autores principales: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2020
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-NAPAC2019-THZBA2 http://cds.cern.ch/record/2836362 |
_version_ | 1780975740960899072 |
---|---|
author | Podlech, Holger Abs, Michel Angulo, Carmen Apollonio, Andrea Bechtold, Alexander Belmans, Jorik Biarrotte, Jean-Luc Bouly, Frédéric Brison, Jeremy Britten, Philipp Doucet, Frédéric Fernandez Ramos, Pedro Gatera, Angélique Höltermann, Holger Joly, Christophe Junquera, Tomas Kümpel, Klaus Lamprecht, Sarah Longuevergne, David Modic, Robert Petry, Nils Pitigoi, Adrian Pompon, Franck Ponton, Aurélien Ratzinger, Ulrich Senée, Franck Uriot, Didier Uythoven, Jan Vandeplassche, Dirk Zhang, Chuan |
author_facet | Podlech, Holger Abs, Michel Angulo, Carmen Apollonio, Andrea Bechtold, Alexander Belmans, Jorik Biarrotte, Jean-Luc Bouly, Frédéric Brison, Jeremy Britten, Philipp Doucet, Frédéric Fernandez Ramos, Pedro Gatera, Angélique Höltermann, Holger Joly, Christophe Junquera, Tomas Kümpel, Klaus Lamprecht, Sarah Longuevergne, David Modic, Robert Petry, Nils Pitigoi, Adrian Pompon, Franck Ponton, Aurélien Ratzinger, Ulrich Senée, Franck Uriot, Didier Uythoven, Jan Vandeplassche, Dirk Zhang, Chuan |
author_sort | Podlech, Holger |
collection | CERN |
description | The main objective of MYRRHA (Multi-purpose hybrid Research Reactor for High-tech Applications) at SCK•CEN, the Belgian Nuclear Research Centre, is to demonstrate the large scale feasibility of nuclear waste transmutation using an Accelerator Driven System (ADS). It is based on a high power cw operated 600 MeV proton Linac with an average beam power of 2.4 MW. Due to the coupling of the accelerator with a fast reactor, a major concern is reliability and availability of the accelerator. Only 10 beam trips longer than 3 s are allowed per 3-month operation cycle, resulting in an overall required Mean Time Between Failure (MTBF) of at least 250 hours. The MYRRHA Linac consists of a room temperature 17 MeV Injector based on CH-cavities and the superconducting main Linac using different RF structures as Single Spokes, Double-Spokes and elliptical cavities. In 2017 it has been decided to stage the project and to start with the construction of a 100 MeV Linac (Injector and Single Spoke section) including a 400 kW proton target station. This facility will be operational in 2026 aiming to evaluate the reliability potential of the 600 MeV Linac. The FrontEnd consisting of an ECR source, LEBT and 1.5 MeV RFQ is already operational while the first 7 CH-cavities are under construction. The presentation gives an overview about the MYRRHA Project, its challenges and the status of construction and testing |
id | cern-2836362 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2020 |
record_format | invenio |
spelling | cern-28363622022-10-20T08:51:17Zdoi:10.18429/JACoW-NAPAC2019-THZBA2http://cds.cern.ch/record/2836362engPodlech, HolgerAbs, MichelAngulo, CarmenApollonio, AndreaBechtold, AlexanderBelmans, JorikBiarrotte, Jean-LucBouly, FrédéricBrison, JeremyBritten, PhilippDoucet, FrédéricFernandez Ramos, PedroGatera, AngéliqueHöltermann, HolgerJoly, ChristopheJunquera, TomasKümpel, KlausLamprecht, SarahLonguevergne, DavidModic, RobertPetry, NilsPitigoi, AdrianPompon, FranckPonton, AurélienRatzinger, UlrichSenée, FranckUriot, DidierUythoven, JanVandeplassche, DirkZhang, ChuanThe MYRRHA ProjectAccelerators and Storage RingsThe main objective of MYRRHA (Multi-purpose hybrid Research Reactor for High-tech Applications) at SCK•CEN, the Belgian Nuclear Research Centre, is to demonstrate the large scale feasibility of nuclear waste transmutation using an Accelerator Driven System (ADS). It is based on a high power cw operated 600 MeV proton Linac with an average beam power of 2.4 MW. Due to the coupling of the accelerator with a fast reactor, a major concern is reliability and availability of the accelerator. Only 10 beam trips longer than 3 s are allowed per 3-month operation cycle, resulting in an overall required Mean Time Between Failure (MTBF) of at least 250 hours. The MYRRHA Linac consists of a room temperature 17 MeV Injector based on CH-cavities and the superconducting main Linac using different RF structures as Single Spokes, Double-Spokes and elliptical cavities. In 2017 it has been decided to stage the project and to start with the construction of a 100 MeV Linac (Injector and Single Spoke section) including a 400 kW proton target station. This facility will be operational in 2026 aiming to evaluate the reliability potential of the 600 MeV Linac. The FrontEnd consisting of an ECR source, LEBT and 1.5 MeV RFQ is already operational while the first 7 CH-cavities are under construction. The presentation gives an overview about the MYRRHA Project, its challenges and the status of construction and testingThe main objective of the MYRRHA project at SCK•CEN, the Belgian Nuclear Research Centre, is to demonstrate the feasibility of nuclear waste transmutation using an Accelerator Driven System (ADS). It is based on a High Power CW operated 600 MeV proton Linac with an average beam power of 2.4 MW. Due to the coupling of the accelerator with a subcritical reactor, a major concern is reliability and availability of the accelerator. The MYRRHA Linac consists of a room temperature 17 MeV Injector based on CH-cavities and the superconducting main Linac using different RF structures as Single Spokes, Double-Spokes and elliptical cavities. In 2017, it has been decided to stage the project and to start with the construction of a 100 MeV Linac (Injector and Single Spoke section) including a 400 kW proton target station. This facility (MINERVA) will be operational in 2026 aiming to evaluate the reliability potential of the 600 MeV Linac. The Front-End consisting of an ECR source, LEBT and 1.5 MeV RFQ is already operational while the first 7 CH-cavities are under construction. The presentation gives an overview about the MYRRHA Project, its challenges and the status of construction and testing.oai:cds.cern.ch:28363622020 |
spellingShingle | Accelerators and Storage Rings Podlech, Holger Abs, Michel Angulo, Carmen Apollonio, Andrea Bechtold, Alexander Belmans, Jorik Biarrotte, Jean-Luc Bouly, Frédéric Brison, Jeremy Britten, Philipp Doucet, Frédéric Fernandez Ramos, Pedro Gatera, Angélique Höltermann, Holger Joly, Christophe Junquera, Tomas Kümpel, Klaus Lamprecht, Sarah Longuevergne, David Modic, Robert Petry, Nils Pitigoi, Adrian Pompon, Franck Ponton, Aurélien Ratzinger, Ulrich Senée, Franck Uriot, Didier Uythoven, Jan Vandeplassche, Dirk Zhang, Chuan The MYRRHA Project |
title | The MYRRHA Project |
title_full | The MYRRHA Project |
title_fullStr | The MYRRHA Project |
title_full_unstemmed | The MYRRHA Project |
title_short | The MYRRHA Project |
title_sort | myrrha project |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-NAPAC2019-THZBA2 http://cds.cern.ch/record/2836362 |
work_keys_str_mv | AT podlechholger themyrrhaproject AT absmichel themyrrhaproject AT angulocarmen themyrrhaproject AT apollonioandrea themyrrhaproject AT bechtoldalexander themyrrhaproject AT belmansjorik themyrrhaproject AT biarrottejeanluc themyrrhaproject AT boulyfrederic themyrrhaproject AT brisonjeremy themyrrhaproject AT brittenphilipp themyrrhaproject AT doucetfrederic themyrrhaproject AT fernandezramospedro themyrrhaproject AT gateraangelique themyrrhaproject AT holtermannholger themyrrhaproject AT jolychristophe themyrrhaproject AT junqueratomas themyrrhaproject AT kumpelklaus themyrrhaproject AT lamprechtsarah themyrrhaproject AT longuevergnedavid themyrrhaproject AT modicrobert themyrrhaproject AT petrynils themyrrhaproject AT pitigoiadrian themyrrhaproject AT pomponfranck themyrrhaproject AT pontonaurelien themyrrhaproject AT ratzingerulrich themyrrhaproject AT seneefranck themyrrhaproject AT uriotdidier themyrrhaproject AT uythovenjan themyrrhaproject AT vandeplasschedirk themyrrhaproject AT zhangchuan themyrrhaproject AT podlechholger myrrhaproject AT absmichel myrrhaproject AT angulocarmen myrrhaproject AT apollonioandrea myrrhaproject AT bechtoldalexander myrrhaproject AT belmansjorik myrrhaproject AT biarrottejeanluc myrrhaproject AT boulyfrederic myrrhaproject AT brisonjeremy myrrhaproject AT brittenphilipp myrrhaproject AT doucetfrederic myrrhaproject AT fernandezramospedro myrrhaproject AT gateraangelique myrrhaproject AT holtermannholger myrrhaproject AT jolychristophe myrrhaproject AT junqueratomas myrrhaproject AT kumpelklaus myrrhaproject AT lamprechtsarah myrrhaproject AT longuevergnedavid myrrhaproject AT modicrobert myrrhaproject AT petrynils myrrhaproject AT pitigoiadrian myrrhaproject AT pomponfranck myrrhaproject AT pontonaurelien myrrhaproject AT ratzingerulrich myrrhaproject AT seneefranck myrrhaproject AT uriotdidier myrrhaproject AT uythovenjan myrrhaproject AT vandeplasschedirk myrrhaproject AT zhangchuan myrrhaproject |