Cargando…
Current status of the End-of-Substructure (EoS) card project for the ATLAS Strip Tracker Upgrade using final ASICs
The silicon tracker of the ATLAS experiment will be upgraded for the upcoming High-Luminosity Upgrade of the LHC (HL-LHC). The main building blocks of the new strip tracker are modules that consist of silicon sensors and hybrid PCBs hosting the read-out ASICs. The modules are mounted on rigid carbon...
Autores principales: | , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1748-0221/18/03/C03016 http://cds.cern.ch/record/2836427 |
_version_ | 1780975747313172480 |
---|---|
author | Boebel, Artur Lorenz Ceslik, Harald Dam, Mogens Diez Cornell, Sergio Garvey, Cameron Michael Goettlicher, Peter Gregor, Ingrid Keaveney, James Michael Van Der Merwe, Max Nikoi Oechsle, Jan Schmitt, Stefan Stanitzki, Marcel Strom, Lars Rickard Wyngaard, Janet Ruth |
author_facet | Boebel, Artur Lorenz Ceslik, Harald Dam, Mogens Diez Cornell, Sergio Garvey, Cameron Michael Goettlicher, Peter Gregor, Ingrid Keaveney, James Michael Van Der Merwe, Max Nikoi Oechsle, Jan Schmitt, Stefan Stanitzki, Marcel Strom, Lars Rickard Wyngaard, Janet Ruth |
author_sort | Boebel, Artur Lorenz |
collection | CERN |
description | The silicon tracker of the ATLAS experiment will be upgraded for the upcoming High-Luminosity Upgrade of the LHC (HL-LHC). The main building blocks of the new strip tracker are modules that consist of silicon sensors and hybrid PCBs hosting the read-out ASICs. The modules are mounted on rigid carbon-fibre substructures, that provide common services to all the modules. At the end of each substructure, a so-called End-of-Substructure (EoS) card facilitates the transfer of data, power, high voltage and control signals between the modules and the off-detector systems. The module front-end electronics transfer data to the EoS card on 640Mbit/s differential lines. The EoS connects up to 28 data lines to one or two lpGBT chips that provide data serialisation and uses a 10GBit/s versatile optical link (VTRx+) to transmit signals to the off-detector systems. The lpGBT also recovers the LHC clock on the down-link and generates clock and control signals for the modules. To meet the tight integration requirements in the detector, several different EoS card designs are needed. Production-ready EoS card’s electronic design integrating final lpGBTv1 and VTRx+ ASICs from CERN are described, as well as results from recent quality assurance tests including detailed characterisation of the opto-electronics system by its bit error rate, jitter, and eye diagram representation. Since each EoS sits at a single-point-of-failure for an entire side of a substructure, a dedicated quality control (QC) procedure for the production has been developed. |
id | cern-2836427 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2022 |
record_format | invenio |
spelling | cern-28364272023-06-13T18:24:19Zdoi:10.1088/1748-0221/18/03/C03016http://cds.cern.ch/record/2836427engBoebel, Artur LorenzCeslik, HaraldDam, MogensDiez Cornell, SergioGarvey, Cameron MichaelGoettlicher, PeterGregor, IngridKeaveney, James MichaelVan Der Merwe, Max NikoiOechsle, JanSchmitt, StefanStanitzki, MarcelStrom, Lars RickardWyngaard, Janet RuthCurrent status of the End-of-Substructure (EoS) card project for the ATLAS Strip Tracker Upgrade using final ASICsParticle Physics - ExperimentThe silicon tracker of the ATLAS experiment will be upgraded for the upcoming High-Luminosity Upgrade of the LHC (HL-LHC). The main building blocks of the new strip tracker are modules that consist of silicon sensors and hybrid PCBs hosting the read-out ASICs. The modules are mounted on rigid carbon-fibre substructures, that provide common services to all the modules. At the end of each substructure, a so-called End-of-Substructure (EoS) card facilitates the transfer of data, power, high voltage and control signals between the modules and the off-detector systems. The module front-end electronics transfer data to the EoS card on 640Mbit/s differential lines. The EoS connects up to 28 data lines to one or two lpGBT chips that provide data serialisation and uses a 10GBit/s versatile optical link (VTRx+) to transmit signals to the off-detector systems. The lpGBT also recovers the LHC clock on the down-link and generates clock and control signals for the modules. To meet the tight integration requirements in the detector, several different EoS card designs are needed. Production-ready EoS card’s electronic design integrating final lpGBTv1 and VTRx+ ASICs from CERN are described, as well as results from recent quality assurance tests including detailed characterisation of the opto-electronics system by its bit error rate, jitter, and eye diagram representation. Since each EoS sits at a single-point-of-failure for an entire side of a substructure, a dedicated quality control (QC) procedure for the production has been developed.ATL-ITK-PROC-2022-018oai:cds.cern.ch:28364272022-10-11 |
spellingShingle | Particle Physics - Experiment Boebel, Artur Lorenz Ceslik, Harald Dam, Mogens Diez Cornell, Sergio Garvey, Cameron Michael Goettlicher, Peter Gregor, Ingrid Keaveney, James Michael Van Der Merwe, Max Nikoi Oechsle, Jan Schmitt, Stefan Stanitzki, Marcel Strom, Lars Rickard Wyngaard, Janet Ruth Current status of the End-of-Substructure (EoS) card project for the ATLAS Strip Tracker Upgrade using final ASICs |
title | Current status of the End-of-Substructure (EoS) card project for the ATLAS Strip Tracker Upgrade using final ASICs |
title_full | Current status of the End-of-Substructure (EoS) card project for the ATLAS Strip Tracker Upgrade using final ASICs |
title_fullStr | Current status of the End-of-Substructure (EoS) card project for the ATLAS Strip Tracker Upgrade using final ASICs |
title_full_unstemmed | Current status of the End-of-Substructure (EoS) card project for the ATLAS Strip Tracker Upgrade using final ASICs |
title_short | Current status of the End-of-Substructure (EoS) card project for the ATLAS Strip Tracker Upgrade using final ASICs |
title_sort | current status of the end-of-substructure (eos) card project for the atlas strip tracker upgrade using final asics |
topic | Particle Physics - Experiment |
url | https://dx.doi.org/10.1088/1748-0221/18/03/C03016 http://cds.cern.ch/record/2836427 |
work_keys_str_mv | AT boebelarturlorenz currentstatusoftheendofsubstructureeoscardprojectfortheatlasstriptrackerupgradeusingfinalasics AT ceslikharald currentstatusoftheendofsubstructureeoscardprojectfortheatlasstriptrackerupgradeusingfinalasics AT dammogens currentstatusoftheendofsubstructureeoscardprojectfortheatlasstriptrackerupgradeusingfinalasics AT diezcornellsergio currentstatusoftheendofsubstructureeoscardprojectfortheatlasstriptrackerupgradeusingfinalasics AT garveycameronmichael currentstatusoftheendofsubstructureeoscardprojectfortheatlasstriptrackerupgradeusingfinalasics AT goettlicherpeter currentstatusoftheendofsubstructureeoscardprojectfortheatlasstriptrackerupgradeusingfinalasics AT gregoringrid currentstatusoftheendofsubstructureeoscardprojectfortheatlasstriptrackerupgradeusingfinalasics AT keaveneyjamesmichael currentstatusoftheendofsubstructureeoscardprojectfortheatlasstriptrackerupgradeusingfinalasics AT vandermerwemaxnikoi currentstatusoftheendofsubstructureeoscardprojectfortheatlasstriptrackerupgradeusingfinalasics AT oechslejan currentstatusoftheendofsubstructureeoscardprojectfortheatlasstriptrackerupgradeusingfinalasics AT schmittstefan currentstatusoftheendofsubstructureeoscardprojectfortheatlasstriptrackerupgradeusingfinalasics AT stanitzkimarcel currentstatusoftheendofsubstructureeoscardprojectfortheatlasstriptrackerupgradeusingfinalasics AT stromlarsrickard currentstatusoftheendofsubstructureeoscardprojectfortheatlasstriptrackerupgradeusingfinalasics AT wyngaardjanetruth currentstatusoftheendofsubstructureeoscardprojectfortheatlasstriptrackerupgradeusingfinalasics |