Cargando…
Water distribution system installed in the HL-LHC IT String
Members of HL-LHC working package 16 and TESI SRL in front of the water distribution system located in SM18. From left to right: Manuel Bussoli, Pasquale Alemanno, Dominique Piednoir, Francesco Dragoni, Marta Bajko, Samer Yammime, Davide Bozzini, Julian Zawilinski, Álvaro Santiago Ferrer, Sebastien...
Autor principal: | Garcia Obrero, Irene |
---|---|
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2837019 |
Ejemplares similares
-
First Energy Extraction Systems units installed in the HL-LHC IT String
por: Garcia Obrero, Irene
Publicado: (2023) -
HL-LHC IT String Control Room
por: Garcia Obrero, Irene
Publicado: (2022) -
Group photo of the participants HL-LHC IT String Day II
por: Garcia Obrero, Irene
Publicado: (2022) -
CDB installation in the HL-LHC IT STRING
por: Zawilinski, Julian
Publicado: (2022) -
Compilation of latest progress on the installation of the HL-LHC IT String in SM18
por: Bajko, Marta
Publicado: (2021)