Cargando…
The second generation of optimized beam orbit measurement (BOM) system of LEP: hardware and performance description
The BOM System with its 504 Beam Position Monitors and 40 Processing Electronics Stations, distributed along the 27 km of the LEP tunnel, has been optimized for all beam conditions and modes of operation. The description of the Beam Position Monitors (or PU) behavior in the tunnel is given. The guid...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
1995
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/283711 |
Sumario: | The BOM System with its 504 Beam Position Monitors and 40 Processing Electronics Stations, distributed along the 27 km of the LEP tunnel, has been optimized for all beam conditions and modes of operation. The description of the Beam Position Monitors (or PU) behavior in the tunnel is given. The guiding approaches for obtaining both main aspects of the critical BOM performances were: a) high reliability, since most of the electronics is not accessible during operation, and b) resolution, precision and stability of the signal processing equipment for the management of the LEP optics, polarization and energy calibration. The finalized analog signal processing chains, both Wide-Band and Narrow-Band, are described. Since local memories allow for the recording of data at each bunch passage during more than 1000 revolutions, it can be followed by a powerful digital signal processing allowing for many modes of beam observation. Examples are presented of beam and machine behavior studies. The BOM System has been a key instrument for the success of LEP operation. |
---|