Cargando…
CMS TBPS construction
Production of CMS detector's TBPS (Tera byte per second) inclined section rings. Replacement of the entire Tracker will take place during LS3 due to 2025.
Autor principal: | |
---|---|
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2839323 |
Sumario: | Production of CMS detector's TBPS (Tera byte per second) inclined section rings. Replacement of the entire Tracker will take place during LS3 due to 2025. |
---|