Cargando…
CMS TBPS construction
Production of CMS detector's TBPS (Tera byte per second) inclined section rings. Replacement of the entire Tracker will take place during LS3 due to 2025.
Autor principal: | Cavazza, Marina |
---|---|
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2839323 |
Ejemplares similares
-
CMS 30 Years Symposium
por: Cavazza, Marina
Publicado: (2022) -
End of the first construction phase of the new CERN Data Centre in Prévessin
por: Cavazza, Marina
Publicado: (2023) -
The 2 Tbps "Data to Surface" System of the CMS Data Acquisition
por: Arcidiacono, R, et al.
Publicado: (2006) -
Construction work on Science Gateway's tube-like corridors
por: Struik, Michael, et al.
Publicado: (2023) -
Do you want to get 40 Tbps?
por: DOMARACKY, Marek
Publicado: (2015)