Cargando…

Architecture and Prototype of the CMS Global Level-1 Trigger for Phase-2

We present the architecture and current state of prototype firmware of the CMS Level-1 Global Trigger, the final stage of the new Level-1 trigger for Phase-2 of the operation of the LHC. Based on high-precision inputs from the muon, calorimeter, track and particle flow triggers, the Global Trigger e...

Descripción completa

Detalles Bibliográficos
Autores principales: Bortolato, Gabriele, Deldicque, Christian, Gigi, Dominique, Huber, Benjamin, Leutgeb, Elias, Lobanov, Artur, Rabady, Dinyar Sebastian, Racz, Attila, Sakulin, Hannes
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1748-0221/18/01/C01034
http://cds.cern.ch/record/2839777
_version_ 1780975987649937408
author Bortolato, Gabriele
Deldicque, Christian
Gigi, Dominique
Huber, Benjamin
Leutgeb, Elias
Lobanov, Artur
Rabady, Dinyar Sebastian
Racz, Attila
Sakulin, Hannes
author_facet Bortolato, Gabriele
Deldicque, Christian
Gigi, Dominique
Huber, Benjamin
Leutgeb, Elias
Lobanov, Artur
Rabady, Dinyar Sebastian
Racz, Attila
Sakulin, Hannes
author_sort Bortolato, Gabriele
collection CERN
description We present the architecture and current state of prototype firmware of the CMS Level-1 Global Trigger, the final stage of the new Level-1 trigger for Phase-2 of the operation of the LHC. Based on high-precision inputs from the muon, calorimeter, track and particle flow triggers, the Global Trigger evaluates O(1000) cut-based and neural-net-based algorithms in a system of up to thirteen Xilinx Ultrascale Plus based ATCA processing boards interconnected by 25 Gb/s optical links. In order to optimize the usage of resource, the main algorithms, including the DSP-based calculation of invariant masses, are implemented at 480 MHz.
id cern-2839777
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2022
record_format invenio
spelling cern-28397772023-06-13T15:02:03Zdoi:10.1088/1748-0221/18/01/C01034http://cds.cern.ch/record/2839777engBortolato, GabrieleDeldicque, ChristianGigi, DominiqueHuber, BenjaminLeutgeb, EliasLobanov, ArturRabady, Dinyar SebastianRacz, AttilaSakulin, HannesArchitecture and Prototype of the CMS Global Level-1 Trigger for Phase-2Detectors and Experimental TechniquesWe present the architecture and current state of prototype firmware of the CMS Level-1 Global Trigger, the final stage of the new Level-1 trigger for Phase-2 of the operation of the LHC. Based on high-precision inputs from the muon, calorimeter, track and particle flow triggers, the Global Trigger evaluates O(1000) cut-based and neural-net-based algorithms in a system of up to thirteen Xilinx Ultrascale Plus based ATCA processing boards interconnected by 25 Gb/s optical links. In order to optimize the usage of resource, the main algorithms, including the DSP-based calculation of invariant masses, are implemented at 480 MHz.CMS-CR-2022-197oai:cds.cern.ch:28397772022-10-17
spellingShingle Detectors and Experimental Techniques
Bortolato, Gabriele
Deldicque, Christian
Gigi, Dominique
Huber, Benjamin
Leutgeb, Elias
Lobanov, Artur
Rabady, Dinyar Sebastian
Racz, Attila
Sakulin, Hannes
Architecture and Prototype of the CMS Global Level-1 Trigger for Phase-2
title Architecture and Prototype of the CMS Global Level-1 Trigger for Phase-2
title_full Architecture and Prototype of the CMS Global Level-1 Trigger for Phase-2
title_fullStr Architecture and Prototype of the CMS Global Level-1 Trigger for Phase-2
title_full_unstemmed Architecture and Prototype of the CMS Global Level-1 Trigger for Phase-2
title_short Architecture and Prototype of the CMS Global Level-1 Trigger for Phase-2
title_sort architecture and prototype of the cms global level-1 trigger for phase-2
topic Detectors and Experimental Techniques
url https://dx.doi.org/10.1088/1748-0221/18/01/C01034
http://cds.cern.ch/record/2839777
work_keys_str_mv AT bortolatogabriele architectureandprototypeofthecmsgloballevel1triggerforphase2
AT deldicquechristian architectureandprototypeofthecmsgloballevel1triggerforphase2
AT gigidominique architectureandprototypeofthecmsgloballevel1triggerforphase2
AT huberbenjamin architectureandprototypeofthecmsgloballevel1triggerforphase2
AT leutgebelias architectureandprototypeofthecmsgloballevel1triggerforphase2
AT lobanovartur architectureandprototypeofthecmsgloballevel1triggerforphase2
AT rabadydinyarsebastian architectureandprototypeofthecmsgloballevel1triggerforphase2
AT raczattila architectureandprototypeofthecmsgloballevel1triggerforphase2
AT sakulinhannes architectureandprototypeofthecmsgloballevel1triggerforphase2